Cuplock Scaffold for Construction High Grade Steel standard

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
100000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Cuplock Scaffold for Construction High Grade Steel standard


Specifications

Best price cuplock scaffolding 
Good bearing capacity . 
Used time long . 
Very good stability . 
Covenient to transport


Advantages:

1.have our own factory (reasonable price)
2.Good bearing capacity 
3.Stable& durable 
4.Easy to assemble or dismantle

  

Cuplock Scaffold for Construction High Grade Steel standard

Cuplock Scaffold for Construction High Grade Steel standard

Cuplock Scaffold for Construction High Grade Steel standard


 Specification 

Product name

Cuplock scaffolding

Components

standard ,ledger,diagonal , top cup, bottom cup,

Ledger Blade

Material

Q235/345/195

Surface

galvanized, Hot dip galvanized, Painted

color

red paint, blue paint, yellow paint, green paint, bright galvanized

size

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8

usege

Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc

Packing

Bulk or Bundle with steel strip

 

 Size:

Standard

Ø48.3×3.25

Q345

Ledger

Ø48.3×3.25

Q235

Diagonal

Ø48.3×3.25

Q235

Size/mm

Weight/kg

Size/mm

Weight/kg

Size/mm

Weight/kg

500

3.45

600

2.54

1300×2000

9.21

1000

5.58

900

3.60

1800×2000

10.31

1300

7.97

1000

4.10

2500×2000

12.16

1500

8.74

1200

4.70



1800

10.60

1250

5.00



2000

11.38

1300

5.20



2500

14.00

1600

6.30



3000

16.63

1800

7.00





2500

9.54




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how long untill i can change my scaffolding bar?
4-6 weeks isn't long enough. You have two fresh piercings that are connected to each other which gives you a bit more of a high risk of one not healing properly. You need to give your body time to let the holes fully heal. Take it from someone who took out her industrial bar 3 months into having it to clean it and had the top hole close up. You really should give it at least 6 months if not longer to fully heal.
Q:What are the requirements for the removal of scaffolding
There are several types of scaffolding, such as fastener type scaffolding, bowl buckle scaffolding, scaffolding scaffolding, the demolition of the basic content of similar, but there are differences
Q:when must you wear safety harnesses on scaffolding?
When you're on the scaffolding, of course.
Q:As Dimmesdale stands beside the scaffold, what does the crowd expect him to do?
e. do his own homework Only joking. It's definitely d. Or c.
Q:The Scarlet Letter scaffold scenes?
concentration your interest on who's on the scaffold, how they react to the standard public shaming, and what the reader learns with regard to the character from analyzing the define of them on the scaffold.
Q:In The Scarlet Letter what is a comparison and difference about the scaffold scene in chapter 1 and 12?
Hey!~ I'm reading that book too! I hate it though. The scaffold scene in Chapter 1 is Hester (and indirectly Pearl)'s public aknowledgement of the sin she committed. That was her way of doing penance and embracing and somehow accepting it. In Ch. 12, Dimmesdale decides to hold an all night vigil there as his way of acknowledging his sin, though not to the community, but to himself. It took him seven years to try and come to terms with his part in the adultery. This scaffold scene is made more signigicant by the fact that the letter A appears via a meteor and the fact that Dimmesdale feels it's directed especially to him. Hope this helps, though I don't know if it fully answers the question. Elaboration is definitely necessary.
Q:Can you give some ideas about scaffolding students through a calss that teaches about religion?
Introduce the basic tenets of several major religions, then work through the historical contexts, and finally, explain your religion's belief system. Good Luck....
Q:Standard Specification for steel tubes for ladder type scaffolding
1, multi function: the construction according to the specific requirements of different groups composed of frame sizes, shapes and bearing capacity of single and double row scaffolding, supporting frame, support columns, material lifting frame, climbing scaffolding, cantilever frame construction equipment and other function. Can also be used to set up construction shed, shed, lighthouse and other structures. The utility model is especially suitable for building curved surfaces and heavy load support frames.2, high efficiency: commonly used rod in the longest 3130mm, weight 17.07kg. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation.3, versatility: the main components are the use of ordinary fastener type steel pipe scaffolding, can be used with ordinary steel pipe connection, universal.
Q:Scaffold ear piercing inflamed?
I used to have a scaffolding piercing but it didn't work out and now I have little bumps at where the 2 holes were. I recommend going to the doctors just to be safe as they will be able to give the best advice, I don't think you would want to end up with bumps on yours like mine. I hope this helps :)
Q:There are many kinds of scaffolding market now, like what kind of scaffold
Now the company's scaffolding are bought, is assembled under the four small wheels mounted on the 4 legs. But do fire and water, the use of the machine is rented. Need to charge, and the car, you can move, will be raised to about 4.5 meters

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range