cup lock system scaffolding Ladders & Scaffoldings

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 PCS
Supply Capability:
10000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

cup lock system scaffolding





Size:

48.3mm

Material:

Q235/225/345

Color:

silver,yellow,black or as your request

Type:

scaffolding system

Surface:

Paint,Galvanized,HDG

Standard:

EN74, BS1139

Thickness:

2.5/2.75/3.0/3.2/3.25/4.0MM

scaffolding system:

cup lock system scaffolding

Stable:

durable

dismantle:

Easy to assemble





Packaging & Delivery

Packaging Detail:in bulk or pallet according to customer's requirement cup lock system scaffolding
Delivery Detail:no more than 15days

Specifications

Best price cup lock system scaffolding 
Good bearing capacity . 
Used time long . 
Very good stability . 
Covenient to transport

Cuplock Scaffolding

 

1.Comperticative price
2.Good bearing capacity 
3.Stable& durable 
4.Easy to assemble or dismantle

  

 Specification

 

Product name

Cuplock scaffolding

Components

standard ,ledger,diagonal , top cup, bottom cup,

Ledger Blade

Material

Q235/345/195

Surface

galvanized, Hot dip galvanized, Painted

color

red paint, blue paint, yellow paint, green paint, bright galvanized

size

Steel pipe diameter is 48.3mm

Thickness :2.75/3.0/3.2/3.25/4.0mm

standard Length:0.5/1.0/1.5/2.0/2.5/3.0M

Ledger length:0.6/0.9/1.0/1.2/1.5/1.8

usege

Our products are used widely in bridge, tunnel, petrifaction, shipbuilding, railway, airport, dock industry and civil building etc

Packing

Bulk or Bundle with steel strip

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Size:

Standard

Ø48.3×3.25

Q345

Ledger

Ø48.3×3.25

Q235

Diagonal

Ø48.3×3.25

Q235

Size/mm

Weight/kg

Size/mm

Weight/kg

Size/mm

Weight/kg

500

3.45

600

2.54

1300×2000

9.21

1000

5.58

900

3.60

1800×2000

10.31

1300

7.97

1000

4.10

2500×2000

12.16

1500

8.74

1200

4.70



1800

10.60

1250

5.00



2000

11.38

1300

5.20



2500

14.00

1600

6.30



3000

16.63

1800

7.00





2500

9.54




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:Key points for safety of portal scaffolding
2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
Q:What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
Q:Have you heard of meat on a scaffold?
Depends on how much it costs to stimulate the growth.
Q:Are Nuclear Matrix and Nuclear Scaffold the same thing?
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range