Cup Lock System Scaffolding Formwork in China Market

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 pc
Supply Capability:
1000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

2.   Main Features of Cup-lock Scaffolding

.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

.Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images


4.   Cup-lock Scaffolding Specification

1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering.

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  


2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.


3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I want an industrial piercing?(Scaffolding)?
It can collapse your cartilage, if you get it done with a gun. If you go to a professional, and they do it with a needle, you'll be fine.
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
The correct answer is: C, D, E optionsThe bowl buckle type steel pipe scaffold inspection and evaluation guarantee project includes
Q:A window washer is standing on a scaffold?
Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
Q:Basically i want to get a scaffolding/industrial done on my ear.?
Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
Q:Do scaffold piercings hurt?
Yes. It like someone pinching you for a short period of time
Q:I am traveling to Buenos Aires in August. Are most of the major monuments under scaffolding now?
Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
Q:Barbell /Scaffold earrings?
actually some claires stuff is good lol. but spencers is where i got mine. if you have one.sometimes at spencers they have deals, i got 4 for $20 i think it was. also culture craze has good ones. theres also hot topic or detox. i hope this helps
Q:When Pearl asks the Minister to stand on the scaffold with them tomorrow what does he say?
He says no. ---- They're, Their, There - Three Different Words. Careful or you may wind up in my next novel. Pax - C
Q:How to calculate the quantity of steel pipe in the support system of the bowl buckle scaffold
1200 or 900 spacing is generally adopted in practice. According to the size of the room are on the line. Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room
Q:Specification for bowl buckle scaffold for construction
In addition, I did not hear that JGJ166-2008 has a new version of ah

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range