• Cup Lock  Scaffolding in Construction from China System 1
  • Cup Lock  Scaffolding in Construction from China System 2
  • Cup Lock  Scaffolding in Construction from China System 3
  • Cup Lock  Scaffolding in Construction from China System 4
  • Cup Lock  Scaffolding in Construction from China System 5
Cup Lock  Scaffolding in Construction from China

Cup Lock Scaffolding in Construction from China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg/m²
Supply Capability:
10000 kg/m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of cup lock Description

cup lock system is one of the most popular used scaffolding system in the world.It is consisted of cup lock,vertical,ledger,limit pins,blades and base etc.

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

2.Main Features of cup lock

1) Using less pipes

2) Easy to install

3) It can be used again and again for nearly 20years

3.Cup lock product pictures:

Cup Lock  Scaffolding in Construction from China

 4.Cup lock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 1.8m

8.6

1.25m * 2.7m

11.45

  5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1) How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

-Cup lock Scaffolding(C-Lock Scaffolding)

-Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2) How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit

Q:First of all, is it painful? Obviously it will be painful I know, but is it severe?Also, what cleaning solutions/products do I need to minimise the risk of infections?And what type of bar should I get? I've heard that Bioplast and PTFE allow for better flexibility and therefore quicker healing, but wouldn't a flexible bar lead to mis-alignment on the two pierced holes? If this is so, what types of steel are safe for initial piercings?Thanks c:
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:For the current stage of China's construction should not strengthen the specific meaning of scaffolding and support by way of the scaffolding and support the specific distinction and significance
In order not to be involved in the whole system due to local errors, the scaffold must be separated from the formwork support, forming a stable system.
Q:What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel
Q:What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:What are the requirements for the sampling inspection of scaffolding?
Quality specification for the cantilever support1 the material of the suspension bearing frame should have the certificate of quality and quality inspection report;2 the height and length of the weld shall meet the design requirements, and shall not have any defects such as welding cracks, structural deformation, corrosion and so on;3 the production quality of the suspension frame shall be in conformity with the provisions of appendix D table D.1.
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:also apprx. what chapters is it in?
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords