CLAMP TYPE EMT ENTRANCE CAPS-ALUMINUM,weather heads, service entrance heads

Ref Price:
$0.05 - 2.50 / pc
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Service Entrance Cap
1 Material: Aluminum
2 Type: Threaded type or Clamp type
3 Size: 1/2 inch—4inch
4 Apply: connecting EMT conduit / IMC conduit
Field Names: Service entrance caps, weather heads, service entrance heads, service entrance kits,
cobra heads, weather caps, utility service caps, meter heads, service heads.


Application:

These service entrance caps attach to the end of plain EMT conduits that are being used to bring over-head
power to buildings or homes. Their clamp-on design and large insulator yoke allows the cables from meers to be hung outside of service heads without the fear of abrasion while waiting fro the utility power connections. 1/2" to 4" sizes are available.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to solve the computer connected to the TV audio problem, how to set the computer and TV audio separation
heat shrinkable casing (MRSG) is a new environmentally friendly halogen-free flame retardant casing, inexpensive products, for wire, cable and wire terminals to provide insulation protection
Q:The difference between nylon balls and geese and ducks
If the 2.5 square copper wire for the output extension cable, 20 meters distance, the total resistance of about 2 * 1.7 * 0.2 / 2.5 = 0.272 (ohms), the current maximum 1.8A, the voltage drop is 0.272 * 1.8 = ), The charging voltage is 55-0.5 = 54.5 (volts), a difference of about 1% will not have any impact on the battery. However, the third floor, said Ye Hao, you can put the charger put the debris room, from your house put a 220V power cord down, home and then engage in a switch control. It is best to design a light at home, can intuitively see if the electricity is full. That's better. Design light, teach you a way: to find a bad leakless protector, open there is a coil-like ring-shaped stuff, called zero sequence current transformer, it will be down, be careful, do not put Transformers inside the coil hurt, get down, in the transformer two thin lines connected to a light-emitting diode. And then your 220V power cord line of fire from the center of the sensor through, around 3-5 turns. In this way, as long as there is current flow, the light-emitting diode will be bright, when the charge is over, the charging current is close to zero, the light-emitting diode will be extinguished. You can from the light-emitting diode is lit to determine whether the electric has been filled. I also have an electric bike that is so charged.
Q:How much of the cable with the switch?
The switch is not selected according to the cable and is selected according to the current. The cable is determined by the size of the power (converted to current) and the distance from which the distance is far. The greater the power distance, the greater the cross-sectional area of the required cable. For example: 15KW motor selection cable current I = P / 1.732UcosΦ = 15 / 1.732 / 0.38 / 0.8 = 28A if it is close (within tens of meters), copper cable 6 square millimeters, aluminum cable 10 square millimeters. If it is in the distance (a few hundred meters), copper cable 10 square millimeters, aluminum cable 16 square millimeters. If it is long distance (close to kilometers), copper cable 16 square millimeters, aluminum cable 25 square millimeters. The switch is regardless of distance, completely based on the load current to choose, generally according to the load current of 1.5 times to 2 times to choose.
Q:1000 kW 600 m cable to use much
Depends on the load is emotional, resistive, should be too long cable, consider the pressure drop. Generally consider 2.5 or more.
Q:5 air conditioning can be used 4 square cable
Such as the extension line added to the adapter primary (city side) certainly easy to use. Extended by two meters, the router does not start, may be extended wire diameter is too thin, bold wire try. If not, choose 6V2A adapter try, the voltage is too high will burn the router. Increase the current is no problem, just like the computer's power, 300-watt power can be replaced, and small is not OK.
Q:Apple 6 Charging Why always show this cable has not yet been certified
1 Definitions and basic tasks Communication lines and ancillary facilities Routine inspection operations are based on regional characteristics of regular light cable line inspection and protection line publicity, timely detection of problems, troubleshooting factors to ensure smooth communication; communication lines and ancillary equipment to make up Strong, to ensure that the optical cable lines and ancillary equipment integrity is good to prevent the occurrence of failure
Q:Is the cable head made of every building?
Generally have every building floor wiring closet must be connected to the big cable. The big cable comes in to do the cable head
Q:What is the type of pipe that is marked as KBG pipe?
Will the general power cable control cable can do the largest square...
Q:25 square copper cable how much money one meter?
3 plus 1 64.13 yuan, 3 plus 2 75 yuan, 4 plus 1 81.38 yuan contact to see my registration name
Q:How to distinguish how many pairs of cable with a large heat shrink tubing
Cable bridge grounding should belong to the protective grounding, grounding resistance at a cross point is not greater than 50 milliohms, no jumper no more than 5 milliohms

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range