• CABLE GLANDS-ZINC  Metal Calbe Connector System 1
CABLE GLANDS-ZINC  Metal Calbe Connector

CABLE GLANDS-ZINC Metal Calbe Connector

Ref Price:
$0.16 - 6.10 / pc get latest price
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:

1.The bolt of Metal Calbe Connector is made of brassor zinc material, beautiful outlook and high quality.
2.Compact structure, water resistant, anti-oil, anticorrosive.
3.DDJ-B Metal Cable Connectors are the fittings for cables.The joints can lock the cables tight and protectively.
Besides the following specifications, the size and thread standard can be varied at your discretion as per requirements.

Cable gland box feature:  
We are providing PG types brass cable gland as one of the many cable accessories that have mostly circular or hexagonal cross sectional area and are used across different industries for various applications. Made up of high quality materials the connectors are bound to follow the industry standards. These are an ideal tool for commercial and industrial uses including transformer connectors,air conditioning and heating. Known to provide smooth connection, Waterproof Connectors have no sharp edges to strip wire. The connectors are durable and resists rough environments. Offered at the cost-effective prices.  

 

 

 

 

 

 

 

 

 

Q:Is the cable head made of every building?
Generally have every building floor wiring closet must be connected to the big cable. The big cable comes in to do the cable head
Q:6 square cable up to how many air conditioning (1.5P)
If it is connected to the 220V of the electricity above the 6 square of the copper line can be
Q:5 air conditioning can be used 4 square cable
Lengthened low voltage side, the line resistance increases, the voltage drop increases. Reduced load capacity. So that the router due to insufficient supply voltage and can not work properly. It is not allowed to use 9V power supply. Voltage is too high, the router part of the internal power supply increased power, heat increased, it is possible to burn the router. It is necessary to extend the power cord, I suggest you extend the power supply side (220V one end) safe and reliable. Increase the voltage to increase the supply current, in the electrical working voltage range (with the electrical work voltage range) is allowed, too low electrical appliances can not work properly. Too high there is the risk of burning appliances, according to your actual situation, marked 5V0.2A that the router works at rated voltage, so the way to improve the supply voltage is not applicable. So you can only improve the power supply power (that is, you say to increase the power supply current rather than voltage). With the reserve power, it will provide enough current at the rated voltage (the router as a resistor, from I = U / R, you can know the danger of increasing the voltage) need help please message
Q:Can the main cable be aluminum cable? And explain why, thank you!
Reply to the landlord: I read a part of the literature, more Google is aware of the following part may be your reference weak construction specifications 1
Q:The difference between nylon balls and geese and ducks
As long as the cable is thick enough, 20 meters of the basic loss can be ignored.
Q:1000 kW 600 m cable to use much
Such a large load so far away, can only be transported with 10KY, near the installation of the transformer Caixing, if the 380V transmission, cross-sectional area, high cost, loss of large, not worthwhile. 10KV high-pressure delivery, current 55A, with 25mm? copper cable 35mm? aluminum cable delivery on it. If the 380V transmission, according to the line voltage loss simple calculation formula △ U% = PL / CS take △ U% = 5 copper cable S = PL / CS △ U% = 1000X600 / 77X5 = / 385 = 1558mm? aluminum cable S = PL / CS = U06 / 46X5 = / 230 = 2307mm? Line voltage loss △ U Simple calculation formula △ U% = PL / CS △ U% - Percentage of voltage loss P - Active power of conveying (Kw) Distance of L- M) C-constant, aluminum single-phase 8.. aluminum three-phase four-wire 46; copper single-phase 12.. copper three-phase four-wire 77S-conductor cross section (mm?) (quoted from "electrical entrance permit test low pressure Class theory "" electrical engineering basis ")
Q:How much of the cable with the switch?
The switch is not selected according to the cable and is selected according to the current. The cable is determined by the size of the power (converted to current) and the distance from which the distance is far. The greater the power distance, the greater the cross-sectional area of the required cable. For example: 15KW motor selection cable current I = P / 1.732UcosΦ = 15 / 1.732 / 0.38 / 0.8 = 28A if it is close (within tens of meters), copper cable 6 square millimeters, aluminum cable 10 square millimeters. If it is in the distance (a few hundred meters), copper cable 10 square millimeters, aluminum cable 16 square millimeters. If it is long distance (close to kilometers), copper cable 16 square millimeters, aluminum cable 25 square millimeters. The switch is regardless of distance, completely based on the load current to choose, generally according to the load current of 1.5 times to 2 times to choose.
Q:25 square copper cable how much money one meter?
Copper should be more than 2.7 flat. Aluminum to 4.5 or more.
Q:3 by 16 cable is a few flat? How? That 5 by 16?
1 Definitions and basic tasks Communication lines and ancillary facilities Routine inspection operations are based on regional characteristics of regular light cable line inspection and protection line publicity, timely detection of problems, troubleshooting factors to ensure smooth communication; communication lines and ancillary equipment to make up Strong, to ensure that the optical cable lines and ancillary equipment integrity is good to prevent the occurrence of failure
Q:What is the meaning of PG + digital markings for electrical wiring?
If no color distinction, 100 meters after you know which line of the fire line which line? The

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches