Ref Price:
$0.05 - 2.50 / pc
Loading Port:
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

EMT couplings are used in dry location to connect the ends of two unthreaded EMT conduits together. EMT aluminum set-screw couplings provide concrete tight connections when taped. Additionally, These set-screw couplings eliminate the need to thread bald conduits to fit old threaded couplings. EMT conduit couplings are pure aluminum material for excellent corrosion protection in damp location.

EMT Coupling
American Standard
UL Standard 514B
Size: Zinc 1/2" to 4"
Aluminum 1/2" to 2"
Set-screw type
Material: Zinc/Aluminum Die Cast


These set-screw couplings are used in dry locations to connect   the ends of two EMT thinwall conduits together. topele’ die-cast aluminum, set-screw couplings provide concrete-tight connections when taped and properly secured with the included set-screw. Topele’ set-screw electrical couplings are rated for electrical applications above 600 volts.








Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to solve the computer connected to the TV audio problem, how to set the computer and TV audio separation
In accordance with the relevant safety regulations, the power cable should not be parallel to the top of the thermal pipe laying, when can not be avoided, the interval distance should not be less than 1000mm, during which should also take effective insulation measures. Power cable and thermal pipe cross, the thermal pipe insulation layer, the separation distance should be not less than 500mm, no insulation layer should not be less than 1000mm, and in the cross with the insulation board to be protected, the length of the insulation board should not be less than d + 2000mm (d for the thermal pipe insulation layer diameter).
Q:The difference between nylon balls and geese and ducks
It depends on the thickness of the wires you use. The thicker the copper wire is, the better. Because the distance will be a voltage drop. So be it, you use a multimeter to look at how long you charge when the output voltage is how much. If you can more than 50 should be no problem. If the voltage is relatively low can change a rough wire, or find a few wires in parallel can also be. I do not know if you can understand it. Even if there is a voltage drop if it is not very powerful should not be the problem, the worst result is the battery charge dissatisfaction. You can try to see how the effect of the day. Certainly will not break your equipment and battery, rest assured it
Q:How much of the cable with the switch?
The switch is selected according to the current. General switch = (2-2.5) Current three-phase current = P / 1.732 / 0.38 / 0.8 Single-phase current = P / 0.22 / 0.8
Q:1000 kW 600 m cable to use much
Such a large load so far away, can only be transported with 10KY, near the installation of the transformer Caixing, if the 380V transmission, cross-sectional area, high cost, loss of large, not worthwhile. 10KV high-pressure delivery, current 55A, with 25mm² copper cable 35mm² aluminum cable delivery on it. If the 380V transmission, according to the line voltage loss simple calculation formula △ U% = PL / CS take △ U% = 5 copper cable S = PL / CS △ U% = 1000X600 / 77X5 = / 385 = 1558mm² aluminum cable S = PL / CS = U06 / 46X5 = / 230 = 2307mm² Line voltage loss △ U Simple calculation formula △ U% = PL / CS △ U% - Percentage of voltage loss P - Active power of conveying (Kw) Distance of L- M) C-constant, aluminum single-phase 8.. aluminum three-phase four-wire 46; copper single-phase 12.. copper three-phase four-wire 77S-conductor cross section (mm²) (quoted from "electrical entrance permit test low pressure Class theory "" electrical engineering basis ")
Q:Apple 6 Charging Why always show this cable has not yet been certified
1 Definitions and basic tasks Communication lines and ancillary facilities Routine inspection operations are based on regional characteristics of regular light cable line inspection and protection line publicity, timely detection of problems, troubleshooting factors to ensure smooth communication; communication lines and ancillary equipment to make up Strong, to ensure that the optical cable lines and ancillary equipment integrity is good to prevent the occurrence of failure
Q:7 kilowatts of electricity with what specifications of the wire
If it is connected to the 220V of the electricity above the 6 square of the copper line can be
Q:What is the type of pipe that is marked as KBG pipe?
If no color distinction, 100 meters after you know which line of the fire line which line? The
Q:25 square copper cable how much money one meter?
There is no 1..2..4.5 square wire. The family uses most of the four wires with 1.. 1.. 2.5 and 4. Power 1KW Approx. 5A.3KW Approx. 15A.2.5 square copper wire can be used. Plug or empty open (25A).
Q:Decoration doubt, what kind of wall can not open the horizontal groove?
Excretion training is the use of positive reinforcement, that is, a variety of food, toys, the best time to reward
Q:How to distinguish how many pairs of cable with a large heat shrink tubing
Cable bridge grounding should belong to the protective grounding, grounding resistance at a cross point is not greater than 50 milliohms, no jumper no more than 5 milliohms

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range