Building Hoist Hot Galvanizing Mast Section Spare Parts with 4ton Capacity

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Building Hoist Description

1.The gearing select perfect bearing,strong cables and oil seal.

2.The electrical parts select products from famous world manufacturers for example Schneider,Siemens and LG.

3.The racks and pinion select advanced material and advanced technique,which enhance the life of all parts.

4.The steel structure adopted strong steel from famous native manufacturers.

5.The surface of the steel structure can adopt paint-spray,parkerizing baking finish or hot galvanizing processing depending on users requirement.

6.The cage can be made and decorated by aluminum molded board,punched-plate or figured aluminum board.


Packaging & Delivery of Building Hoist

Packaging: nude and wooded box           Delivery: 25-30days


Mains Parts of Building Hoist

1.The steel structure for example the mast, tie in and cabin ,could be all spay-painted and hot galvanized. Mast section is made with high quality Q345B which is the top standared in China.

2.Electrical parts are all adopted with Schneider , Siemens and other famous brands.

3.The electrical system can be selected with the normal control method and VVVF+PLC control way. Inverter we selected is from Schneider. Yaskawa or other world renowned brand.

4.Cabin exit door select ramping type. The ramping door looks like a bridge between the construction hoist and construction building.

5.The cabin floor is made from 3MM thickness steel riffled boardHot dip galvanized, and 15MM thickness wooden board which can reduce the vibration and deformation a lot.

6.Driving unit is adopted the products from ZHANGJIANG and other reputed maker, or from SEW, NORD.

7.Safety system is mainly composed of electrical motor braking, anti-drop safety device, top & bottom limit switches, top & bottom 3-phase switches, door limit switches, buffer device and over-load protection. The system aims to ensure the hoist are running safely.

8.Qualification: CE, ISO9001:2008 and etc.

9.The long-term operation of CMAX building hoists testifies CMAX hoist is working performance is stable.


Building Hoist Images

Building Hoist European Standard Electric Parts with 3.2ton Capacity

Building Hoist European Standard Electric Parts with 3.2ton Capacity

Building Hoist European Standard Electric Parts with 3.2ton Capacity



Building Hoist Specification


Building Hoist European Standard Electric Parts with 3.2ton Capacity




FAQ of Building Hosit

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The tower crane is on a surface with the construction elevator, and only 2 or 3 meters away. Is that allowed
Cranes and elevators from very close, may be the reason for the sites or the position is not reasonable, so close to the distance as long as you ensure the tower crane and tower crane arm when rotating to the above the elevator after satisfying the end, must keep more than 2 meters with elevator recent distance. Or you can refer directly to the tower crane safety code, GB5144-2006.
Q:Why is the construction elevator not so close to the structure?
Isn't there a car? Normally, the center line of the car should be in the same line as the support frame center. If the frame body (standard) get into the building, inevitably cause capsules center, usually the center of gravity and center is not a straight line on the standard section, capsules will force up and down roller, increase and the frame body wear, and certainly not safe.
Q:How large a leakage protector is used for the construction elevator
A leakage switch with a rated current of 100-160a. The rated action current of the second class is 50-75hm. The rated action current is 30-45hm. The action time is less than or equal to 0.1 s. Comply with safety specification according to this construction.
Q:There are differences between the construction elevator and the construction elevator
When it comes to the construction elevator, people will immediately think of construction lifter, the construction elevator and elevator is just a different name or have their own respective working principle? By below small make up to you to introduce: construction elevator is often referred to as construction lifter, but construction lifter, including the definition of a broader platform construction also belongs to the construction lifter series.
Q:Why is the construction elevator not up to the roof
The free end of the construction of the lift height is only 7.5 meters high, general construction elevator drive now is the case, so the hoisting cage height and drive around 4.5 meters high, the other national standard construction elevator ceiling limit moves, drive above about 1.8 meters away from the top of the rails. So it's the free end of the construction elevator that can't satisfy the roof. As long as they can set up effective adhesion measures, they can also get on the roof.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
There is a detailed picture of the elevator. The structure of the elevator well and the layout of the embedded parts.
Q:Can construction elevators be taken by people or by goods
The construction elevator can be taken either by person or by cargo Material hoist (dragon door frame, well frame) can be carried only, not by person
Q:How does the construction elevator add up
The principle is simple Now, the construction of a manned, cargo-carrying construction elevator is a gear rack. You can't understand how to say that you can't understand
Q:How to set up the construction elevator?
According to drawings, find the embedded at the scene near the level of architectural axis positioning and high elevation line (50 wire or 1 m wire) location and double-check, axis dividing levels as much as possible in accordance with the size distribution. Find out after each axis, measuring building contour, and map measure the buildings, and building construction drawing contrast, timely transfer measurement results to the designer, designer analyze the error and make changes
Q:Whether the construction elevator is a dual-purpose elevator
The construction elevator is being operated on; And a person's elevator is automatically controlled; The construction elevator is directed by the rack, which is seen in the rack, and the noise is large. The escalator is not a rack, it is usually guided, and the rails are invisible. Construction elevators are rudimentary; And the elevator is complicated.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range