Building Hoist European Standard With 1.5ton Electric Part

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
10 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Power Source: Electric Maximum Lifting Weight: 1.5ton Maximum Lifting Height(M): 100m
Lift Speed: 36m/min

Product Description:

Structure of Building Hoist Description

1.The gearing select perfect bearing,strong cables and oil seal.

2.The electrical parts select products from famous world manufacturers for example Schneider,Siemens and LG.

3.The racks and pinion select advanced material and advanced technique,which enhance the life of all parts.

4.The steel structure adopted strong steel from famous native manufacturers.


Packaging & Delivery of Building Hoist

Packaging: nude and wooded box           Delivery: 25-30days


Mains Parts of Building Hoist

1.The steel structure for example the mast, tie in and cabin ,could be all spay-painted and hot galvanized. Mast section is made with high quality Q345B which is the top standared in China.

2.Electrical parts are all adopted with Schneider , Siemens and other famous brands.

3.The electrical system can be selected with the normal control method and VVVF+PLC control way. Inverter we selected is from Schneider. Yaskawa or other world renowned brand.

4.Cabin exit door select ramping type. The ramping door looks like a bridge between the construction hoist and construction building.

5.The cabin floor is made from 3MM thickness steel riffled boardHot dip galvanized, and 15MM thickness wooden board which can reduce the vibration and deformation a lot.


Building Hoist Images

Building Hoist European Standard Electric Parts with 3.2ton Capacity

Building Hoist European Standard Electric Parts with 3.2ton Capacity

Building Hoist European Standard Electric Parts with 3.2ton Capacity



Building Hoist Specification


Building Hoist European Standard Electric Parts with 3.2ton Capacity




FAQ of Building Hosit

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How large a leakage protector is used for the construction elevator
A leakage switch with a rated current of 100-160a. The rated action current of the second class is 50-75hm. The rated action current is 30-45hm. The action time is less than or equal to 0.1 s. Comply with safety specification according to this construction.
Q:The construction elevator should have those procedures
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content.
Q:How do construction suspension scaffolding be handled in the people's elevator?
The shelf of the discharge platform is separated from the outer scaffolding and set up separately! Can't connect together
Q:What about the energy efficiency of the escalator
Construction elevator adopts frequency conversion stepless speed, smooth braking, small impact on the grid, and energy saving effect is obvious, ordinary construction elevator running speed is 36 m/min, motor, 3 * 11 kw; Frequency conversion construction elevator running speed can reach at low speed: 0-46 m/min, motor: 2 * 11 kw, whether in theory or in practical construction, energy saving effect is remarkable, some developed coastal areas in frequency conversion construction elevator as mainstream products has become a trend.
Q:When does the construction elevator take off?
If the elevator is installed later, can the construction elevator be demolished at this time? It should not be removed because the elevator is used by the local technical supervision bureau. The unused elevator will be fined 5-200, 000 fine and the elevator installation unit will be revoked. No one will take that risk! It is usually done on rooftops, indoors and outdoors, and the materials have been transported upstairs. It is best to be able to remove the elevator when it is finished, so it doesn't affect the progress.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
The door locks must be in the direction of the elevator, and the people on the floor are not allowed to move at will, only the driver will be able to move. The other is that the height of the door must be 1.8 meters high, so that the workers' heads don't reach out to the danger.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
Supplement: Component members: project manager, safety personnel, inspectors, field director, technical director, foreman, elevator operation (mechanical, electrical installation and maintenance) welders, electricians, scaffolder, etc. The subcontract unit project manager shall have a certificate of construction, and special work shall be given the special work certificate. If the special work certificate is outside the province and province, the construction committee of the construction site should be put on the record.
Q:What is the meaning of double straps in the construction elevator?
With double cage for heavy, namely SCD200/200 series Is the two cages, each cage has a corresponding weight, the weight up and down in the elevator cage rise to energy conservation and reduce the reaction between the up and down, when you imagine front-rear door principle is about the same
Q:The staff on the construction platform shall not exceed the number of people
Different models have different load rating and platform lift platform size, this depends, suzhou new aluminium alloy elevator, Lin professional aluminum alloy lift platform.
Q:What is the safety device for construction elevator?
A lot of 1, anti-drop safety device 2, upper and lower limit 3, extreme limit 4, buffer spring 5, line door limit switch Single line door limit switch 7, ceiling switch 8, enclosure door lock 9, single door lock The door lock is on and off There are also many electrical safety protections

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range