• Building Hoist 3000kg Single Cage New Design System 1
  • Building Hoist 3000kg Single Cage New Design System 2
  • Building Hoist 3000kg Single Cage New Design System 3
  • Building Hoist 3000kg Single Cage New Design System 4
  • Building Hoist 3000kg Single Cage New Design System 5
  • Building Hoist 3000kg Single Cage New Design System 6
Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Structure of Building Hoist Description

 

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance. The gearing adopted bearing,enameled cable, and oil seal. The racks and pinion adopts specal material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers. The surface of the structure can apply paint-spray, parkerizing baking finish or hot galvanizing processing according to users requirments. The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Hoist

 

1. The recomended cage dimension(L*W*H)(m): 2.0*1.0*2.5, 2.5*1.0*2.5, 2.5*1.3*2.5, 3.0*1.5*2,5, 3.2*1.5*2.5, 3.8*1.5*2.5, 4.0*1.5*2.5, 4.2*1.5*2.5 etc. We can also manufacture cages of other size according to the user.
2. The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to yout requirements.
3. The mast section and the tie-in surface can adopt paint-spray, or hot galvanizing processing.. 

Building Hoist Specifiction 

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage building hoist can be changed into single cage type,

 

  TypePayload(kg)Lifting Speed         (m/min)Motor Power(kw)Safety Device
Single Cage HoistNo CounterweightSC1001000332*11SAJ30-1.2
SC1201200332*11SAJ30-1.2
SC1601600332*11SAJ30-1.2
SC2002000333*11SAJ40-1.2
SC2502500333*11SAJ50-1.2
SC2702700333*15SAJ50-1.2
SC3003000333*15SAJ50-1.2
SC3203200333*15SAJ50-1.2
With CounterweightSCD2002000332*11SAJ40-1.2
SCD2502500332*11SAJ50-1.2
SCD2702700332*15SAJ50-1.2
SCD3003000332*15SAJ50-1.2
SCD3203200332*15SAJ50-1.2

 

Images of Building Hoist

 

 

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

Building Hoist 3000kg Single Cage New Design

 

FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance& exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

 

Q:What's going on with the decline in construction lift
Check whether the brake work is valid.Check to see if there is any problem with holding the brake.
Q:The safety officer shall be responsible for the work of the construction elevator
(1) the use of dual-use functions of the construction elevator, the installation and removal of the professional personnel issued by the competent department of construction administration shall be undertaken by the professional personnel. The personnel who have passed the training, qualified for the examination and obtained the certificate of the post shall be operated and repaired. (2) the capacity of the concrete base culture cooperation should not be less than 150kPa, the tolerance of 10mm and the drainage facility should be allowed. The distance between the guide bracket of the elevator and the wall of the building should be suitable, and the smoothness should be stable. (3) the lifter is used to control two directions, and the vertical control is 0.05%. Each floor shall have a platform, a passage, a fence and a protective door. No obstacles can be found. (4) the elevator that is installed in a dark place, and the passage shall be illuminated and a floor display lamp and floor number; A closed barrier should be set up in the well. The elevator shall be subject to acceptance by the technical director and the relevant departments, and shall be tested by the crash and shall be used in the rear. (5) in the use of or during the use of the elevators, the manufacturer or designated unit shall conduct the debugging and maintenance and verification. The lifter should undergo a fall test every three months and the fall test should be adjusted when the fall test exceeds 1.2 m. Every time it falls, the receiver should be repaired once.
Q:A lift motor is 7.5 KW, and the frequency converter sends current 4.2 A, which has A heating resistance in the converter, and how the charge is calculated when the lift is full. Or consider the power of the converter and the power of the thermal resistance.
Use electricity in the field (1) lifting equipment class: tower crane 2, construction elevator 3; According to the table, K = 0.3 cos phi = 0.7 tg phi = 1.02 JC = 40% (temporary load) Pe = 2 times 63 + 3 times 11 = 159 (kW) And then power: PS = 2 times Pe = 2 times 159 = 201 (kW) Pjs1 = K * PS = 0.3 * 201 = 60.3 (kW) Qjs1 = tg phi by Pjs1 = 1.02 times 60.3 = 61.5 (kVA)
Q:How do construction suspension scaffolding be handled in the people's elevator?
The shelf of the discharge platform is separated from the outer scaffolding and set up separately! Can't connect together
Q:When does the construction elevator take off?
This is not specific time, it is the contractor's own
Q:Where is the location of the elevator in the project
Construction elevator location setting, need to take into consideration the situation of the scene and the layout of the building, should consider the following factors: To facilitate the conveyance of material transportation, choose the more spacious rooms in the layout of the floor as import and export; The outside of the elevator is as spacious as possible, with construction channels and materials. The construction materials are minimized in the floor, usually in the middle of the flat. The construction personnel are handy; Monomer building expansion joints at the junction, traffic between unit set up by the elevator capsules export operation platform is completed, so the corresponding reduced floor wall body of the reserved hole lien expansion joints
Q:The staff on the construction platform shall not exceed the number of people
Depending on the actual situation, different quality of platform specifications will affect the number of people manned. Hope can help you.
Q:How many floors are built to use the construction elevator? With six floors?
The country stipulates above 7 floor to be installed elevator, of course 7 below can be installed not outfit, average 7 floor below is a ladder of ladder of ladder of ladder of ladder of ladder of ladder of ladder of ladder of stairs and so on
Q:How many guides are in the construction elevator
A guide frame on each side of the construction elevator, which is formed by using the section of the standard section in section 1.
Q:What is the meaning of double straps in the construction elevator?
Used for heavy to offset the hoisting cage weight so as to realize energy-saving province electric hoist, by making use of the fixed pulley for heavy gravity into upward traction hanging basket of traction, so as to reduce the drive motor load, achieve energy saving.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords