Adjustable jack base/Screw Jack for Scaffolding
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding jack base
Solid Jack Base
Dimensions: Diameter 32/34/38mm,
Base plate 150x150x5/6mm,As your request
length 600,914,1524mm as your request
Feature:
1)Heavy duty steel construction.
2)Galvanised for long lasting protection.
3)Used for propping timber or steel beams.
Hollow Screw Jack Base
Dimensions: Diameter 32/34/38mm,
Base plate 143x143x5/6mm,As your request
length 600,914,1524mm as your request
Surface: Electro galvanized, Hot dip galvanized, or painted
Standards: EN74
OEM service available
Item | Hollow Screw Jack Base |
Material | Q235 |
Dimensions | 35/38mm, 100x150mm, 600,914,1524mm |
Surface | Hot-dip galvanization, electro galvanization |
Standard | EN74 |
Note | OEM service is available |
MOQ | 1000pieces |
Package | in steel pallet ,or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
Rizhao Fast and Fasten Scaffold Co., Ltd. is a professional manufacturer and supplier of scaffolding systems, scaffolding couplers, and other related products. With good quality and competitive price, our products are very popular in European, Australia, North America, Mid-east, and South East Asia and some African countries.
Packing
in bulk , pallet or as your request
- Q:What are the components of a mobile scaffolding
- The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
- Q:Want to rent the scaffolding in the county, you need to cast how much money
- Look what you want to do. Store rent is not.
- Q:Where to use scaffolding in construction
- 5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
- Q:What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- That first answer is correct. When I worked as a construction electrician back in the 1980's the OSHA requirements were not so strict, but now the harnesses and tie-offs are required for any work platform over 6' from the ground.
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q:Can you do the outer scaffolding?
- (2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm
- Q:What does scaffold one's days mean? kill time?
- In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
- Q:what is the height of a scaffold if the person is 6ft tall?
- Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
- Q:how did they turn the cells into a polymer for the heart scaffold ?
- May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
- Q:What are the functions and requirements of the masonry wall
- 4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Adjustable jack base/Screw Jack for Scaffolding
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords