Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
MODEL | STANDARD | DX/CX6K | DX/CX 10K | DX/CX6KL | DX/CX10KL | |
CAPACITY | VA/W | 6KVA/4.8KW | 10KVA/8KW | 6KVA/4.8KW | 10KVA/7KW | |
INPUT | Nominal Voltage | 220/230/240VAC | ||||
Voltage Range | 120-275VAC | |||||
Frequency Range | 46-64Hz: 50Hz, 60Hz auto sense | |||||
Phase | Single phase with Ground | |||||
Power Factor | >=0.99 | |||||
OUTPUT | Voltage | 220/230/240*(1±1%)VAC | ||||
Frequency | 50/60Hz(Adjustable)
50Hz AC Mode: Follow AC Mode (AC Range 46~54Hz); Battery Mode: 50Hz(1±0.1%) 60Hz AC Mode: Follow AC Mode (AC Range56~64Hz); Battery Mode: 60Hz(1±0.1%)
| |||||
Wave Form | Pure Sine Wave | |||||
Power Factor | 0.8 | |||||
Harmonic Distortion | =<2% THD (Linear Load), =<6% THD (Non-Linear Load) | |||||
Overload Capacity | Normal when load < 105%; 105%-125% for 1 min, 125%-150% for 30sec | |||||
Current Crest Ratio | 3:1 | |||||
Connections | Terminal block | |||||
Efficiency | To AC Mode | 88% | ||||
To Battery Mode | up to 90% | |||||
Battery | Type | Sealed free maintenance lead acid battery | ||||
Nominal DC voltage | Built in batteries 12v7.2ah*16pcs | 192VDC | 192VDC | |||
Quantity | 16pcs | 16pcs | Depends on requested back-up time | Depends on requested back-up time | ||
Back-up Time (Full load) | >=7 min | >=5 min | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | ||
Recharge Time | 7 hours to 90% | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | |||
Charge current(MAX) | 2.0A | 4.2A or 8A | 4.2A or 8A | |||
Charge voltage | 220Vdc ± 1% | |||||
Bypass | Automatic Transfer | On overload and UPS failure | ||||
Before UPS Power-on | Default "ON" user adjustable to "YES" | |||||
Transfer Time |
| Zero | ||||
Indicators | LCD Display | UPS status, I/P & O/P voltage& frequency, Battery voltage, Battery capacity, Loading, Fault code | ||||
Audible Alarm |
| Bypass, On battery mode, Battery low, Overload, Fault | ||||
Acoustic noise | At 1 meter distance | <55dB | ||||
Communications | Intelligent RS232 serial port | Windows 98/NT/2000/XP/2003, Linux, Sun Solaris, IBM Aix, Compaq True64, SGI IRIX, FreeBSD, HP-UX, and MAC | ||||
SNMP (Optional) | Power management from SNMP manager and web browser | |||||
USB (Optional) | Windows family software and Mac OS | |||||
Environmental | Operating Temperature | 0~40 °C | ||||
Operating Humidity | 20~90% ( Non Condensing) | |||||
Weight | Net weight (kg) | 84 | 93 | 35 | 38 | 35 |
UPS Dimension | L*W*H (mm) | 570*260*717 |
- Q:Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- 220V500W more power saving:Reasons: 1, high voltage, small current, line loss is small; 2, reduce the transformer and other intermediate links, each link has a loss.
- Q:The difference between lighting transformers and control transformers
- In principle and construction, there is no difference between the two.The only difference is that the secondary coil output voltage is different.
- Q:The transformer zero line has broken, has the result to the household illumination circuit?
- The power supply system in three-phase four line zero line is broken, the breakpoint of the single-phase circuit (220V) electrical burn by voltage to 380V. I met, the incandescent lamp suddenly particularly bright then the blow up of internal fuse TV has burned out. So in the three-phase four wire power supply system zero line asked to do repeat grounding in households is the reason.
- Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Pe=19.5KW, installed capacityKx=1 coefficient of demandPjs=KxPe=19.5KW, calculated loadCOS, phi, =0.85, power factorIjs=KxPe/3/220/cos phi (Ijs calculates current, voltage, 380V/220V, three-phase)=1*19.5*1000/3/220/0.85=34.76A
- Q:Is the substation separate from the power and illumination transformer?
- The power and illumination of the substation are all used on a transformer, which is separated by power and lighting by the station screen of this transformer.
- Q:What transformer can be used in a safety voltage lighting transformer?
- 220V/36V or 24V isolation transformer. Double winding, high and low voltage coils, not connected.
- Q:Power and lighting transformers, lighting quality will be affected much?
- The bulb adopts a luminous two stage tube combined lamp holder, and the calculation process is very complicated. The secondary voltage is different in different combinations. Because it is a direct current ignition, but also consider the efficiency of its rectifier, but the total power is unchanged.
- Q:How many power illuminator can 5Kva 36V transformer drive?
- Of course, if you want to bring more is not impossible, but depends on the working conditions, the actual power = nominal power, short time use (to ensure that the transformer temperature rise is not too high) is also available
- Q:Line lights, lighting transformers in use!! Can live line work?!! Be afraid of electric shock 40
- Line lights, lighting transformers in general how many low voltage, can live operation, but to do safety measures. For example, do not short-circuit, damp environment, wear insulation shoes, wearing insulating gloves and so on.In fact, all the voltage levels, as long as safety measures can be done live operation.
- Q:How is the lighting power of the 380V transformer calculated?
- The transformer (Transformer) principle should change the AC voltage of the primary coil, the main component of the device level by using electromagnetic coil core (core) main functions: voltage transformation, current transformer, impedance converter, isolation, voltage regulator
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords