Lift Table Scissor Lift Table U.S. Type Manual Lift Table SP800
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Lift Table Scissor Lift Table U.S. Type Manual Lift Table SP800
● Valuable material handling equipment for use as a feeling table on assembly line.
● Structural heavy duty steel construction.
● Easy action foot operated hydraulic lift for raising table top to desired level.
● Hand operated table descent control.
● Over load-pass valve protects operator and pump.
MODEL | SP800 | |
Capacity | kg | 800 |
Max. lift height | h12(mm) | 1000 |
Min. height of table | h13(mm) | 420 |
Lifting height | h3(mm) | 580 |
Table size | l×b5×s(mm) | 1000×510×55 |
Total height | h14(mm) | 996 |
Overall length | l1(mm) | 1150 |
Foot pedal cycles to max height | ≤70 | |
Wheel diameter | d(mm) | 150 |
Qty./20’ Container | PCS | 52 |
Service weight | kg | 103 |
Carton size | mm | 1190×630×460 |
Advantages
1 sincere
CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.
2 professional
Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.
3 quality
CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.
4speed
We have professional sales team to guarantee your reply within 12hours to save your precious time.
5 After sales
If the tower crane has any problems, we will solve your problems in first time.
FAQ
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4. After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q:Put a large beaker of water on a horizontal platform and put a light glass upside down in the water
- The inside of the large beaker is raised, the pressure on the surface of the large beaker is larger, and C is right. The pressure of the bracket on the glass is downward, the pressure of the gas is rising, the glass gravity is constant, the pressure of the bracket is greater for the glass, and the D is wrong
- Q:What can be done when the hydraulic platform is down?
- Your reason is simple: the oil always goes to the small oil tank, causing the load to be light first, and the cylinder is out of sync. The solution in the economy is to buy a synchronous shunt valve for the oil supply of two cylinders. In the transfer valve A or B, one is solved
- Q:To make a four trapezoid screw lifting up seven tons of lifting platform should be matched with the straight screw and motor
- A lift platform system, we are doing, you should tell your system speed, accuracy, and so on parameters, can calculate the motor power, speed, lead, lead screw diameter, guide rail, can communicate in detail
- Q:How does hydraulic platform change sealing ring, how to operate
- Remove the hydraulic cylinder. Before the hydraulic cylinder is disassembled, the oil pressure in the hydraulic cylinder circuit should be reduced to zero. Remove the parts from the hydraulic cylinder when disassembling.
- Q:The hydraulic platform can't rise. Why?
- You can see here. Understand how the hydraulic platform works. A lot of things will be clear
- Q:How to use the elevator to be safer and more efficient
- Constantly check the operation of the various agencies is normal, have no noise, if find fault, the elevator must be eliminated in time. 2, check the connection of the ministries, such as loose should be tight. When the compression of the connecting bolts should be in body check firmness, slightly shaft must have a split pin all connections, and to open fully. Always check all electrical wires and cables for damage. Make sure to cover and replace damaged parts in time. When the motor is overheat, stop the engine in time, and then keep running after the failure. The motor bearing lubrication is good.
- Q:Who can tell me the purpose of the elevator? The more, the better
- Walking auxiliary dual mast lifts: ability to work in different condition, without external power supply, mobile and flexible, easy to operate, lift freely, only one person can complete forward, backward, steering, fast, slow to walk and up and down movement, save work, energy saving. Especially suitable for the station, docks, airports, stadiums, large enterprises such as large range of aerial work in domestic at present is the most ideal aerial work equipment. The series is a two-mast lifting system with strong stability and other characteristics.
- Q:What is the size of the hydraulic elevator platform for 2T
- Product structure strong, big load, steady lifting, simple and convenient installation and maintenance, is economic and practical alternative between low floor elevator ideal goods transportation equipment. According to the requirements of the lifting platform installation environment and use, can choose different stationary hydraulic lift, choose different optional configuration, lifting goods task, achieve better use effect.
- Q:What is the hydraulic platform driven
- The engine or motor drive oil pump can also be used manually.I hope my answer will help you.
- Q:When the hydraulic platform drops, it feels very shaken and unbalanced. Please answer?
- Connected to the solenoid valve is the control valve core, if it is to be repaired. To change oil, you need to lift it up to the top, and then use the safety support frame or stick to support it so that you can do what you want
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Lift Table Scissor Lift Table U.S. Type Manual Lift Table SP800
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords