• Widely Used Construction Concret Aluminum Formwork Hot Sale System 1
  • Widely Used Construction Concret Aluminum Formwork Hot Sale System 2
  • Widely Used Construction Concret Aluminum Formwork Hot Sale System 3
  • Widely Used Construction Concret Aluminum Formwork Hot Sale System 4
  • Widely Used Construction Concret Aluminum Formwork Hot Sale System 5
  • Widely Used Construction Concret Aluminum Formwork Hot Sale System 6
Widely Used Construction Concret Aluminum Formwork Hot Sale

Widely Used Construction Concret Aluminum Formwork Hot Sale

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete pouring aluminum formwork system


Concrete pouring aluminum formwork system Advantage

1. Light weight, high strength

 

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

 

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

 

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

 

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

 

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality


The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

 

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

 

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

 

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

 

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.


Concrete pouring aluminum formwork system picture

Widely Used Construction Concret Aluminum Formwork Hot Sale


Widely Used Construction Concret Aluminum Formwork Hot Sale


Widely Used Construction Concret Aluminum Formwork Hot Sale


Widely Used Construction Concret Aluminum Formwork Hot Sale

FAQ


How test the quality?


we have strict quality control department, and when finished the production, we'll try installation first at our factory to find whether have probelm.

Q:What is the change in the aluminum template?
The turnover of the aluminum template is determined by the use of performance. The use of aluminum template system to improve the overall construction efficiency of the construction industry, including in the building materials, artificial arrangements are greatly saved a lot of aluminum template, also known as aluminum alloy template, is made of aluminum alloy building templates, to solve the traditional The existence of defects in the template, greatly improving the construction efficiency.
Q:Now the domestic use of aluminum template project more?
Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
Q:In the Sheng-aluminum template installation workers, how to develop prospects
Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
Q:What is the development prospect of aluminum template design?
Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
Q:Whether a shear wall aluminum template and wood template can be mixed
The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
Q:Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords