W11S NC Plate Rolling Machine,roll plate bending machine,metal rolling machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Real Case for Lower MOQ:
Products Name | MOQ(in the last 12month) |
---|---|
Press Brake | 1 Set |
Shearing Machine | 1 Set |
Rolling Machine | 1 Set |
Blade and Mould | 1 Piece |
Real Case for Large Contract:
Products Name | Order(in the last 12month) |
---|---|
Press Brake | 6 Sets |
Shearing Machine | 6 Sets |
Rolling Machine | 5 Sets |
Blade and Mould | 20 Pieces |
Short Lead Time:
Products Name | Order(in the last 12month) | Shortest Lead Time |
---|---|---|
Press Brake | 1 Set | 15 Days |
Shearing Machine | 1 Set | 15 Days |
Rolling Machine | 1 Set | 15 Days |
Blade and Mould | 1 Piece | 15 Days |
W11S-30×2500
The main parameters
items | unit | technical parameters |
Machine specifications | mm | W11S-30×2500 |
Control form | NC | |
Maximum bending roll steel plate thickness | mm | 30 |
Maximum pre-bend steel plate thickness | mm | 25 |
Maximum bending roll steel plate width | mm | 2500 |
diameter of upper roller | mm | 460 |
diameter of lower roller | mm | 260 |
Center distance of lower roller | mm | 420 |
Main motor power | kw | 37 |
Hydraulic motor power | kw | 15 |
W11S
Model | Max width of plate (mm) | Max. thickness of plate (mm) | Thickness of pre-bend (mm) | Diameter of upper roller (mm) | Diameter of lower roller (mm) | Center distance of lower roller (mm) | Main motor power (kW) | Hydraulic motor power (kW) |
W11S-8×2000 | 2000 | 8 | 6 | 235 | 135 | 180 | 5.5 | 2.2 |
W11S-8×2500 | 2500 | 8 | 6 | 245 | 145 | 200 | 7.5 | 4 |
W11S-12×2000 | 2000 | 12 | 10 | 255 | 150 | 245 | 7.5 | 4 |
W11S-12×2500 | 2500 | 12 | 10 | 300 | 165 | 270 | 11 | 5.5. |
W11S-12×3200 | 3200 | 12 | 10 | 320 | 180 | 300 | 15 | 5.5 |
W11S-16×2000 | 2000 | 16 | 12 | 300 | 165 | 270 | 11 | 5.5 |
W11S-16×2500 | 2500 | 16 | 12 | 320 | 180 | 300 | 15 | 5.5 |
W11S-16×3200 | 3200 | 16 | 12 | 380 | 200 | 330 | 22 | 7.5 |
W11S-20×2000 | 2000 | 20 | 16 | 320 | 180 | 300 | 15 | 5.5 |
W11S-20×2500 | 2500 | 20 | 16 | 380 | 220 | 360 | 22 | 7.5 |
W11S-25×2000 | 2000 | 25 | 20 | 380 | 220 | 360 | 22 | 7.5 |
W11S-25×2500 | 2500 | 25 | 20 | 410 | 235 | 380 | 30 | 11 |
W11S-30×2000 | 2000 | 30 | 25 | 410 | 235 | 380 | 30 | 11 |
W11S-30×2500 | 2500 | 30 | 25 | 460 | 260 | 420 | 37 | 15 |
W11S-30×3000 | 3000 | 30 | 25 | 480 | 260 | 420 | 37 | 15 |
W11S-30×3200 | 3200 | 30 | 25 | 510 | 275 | 460 | 45 | 15 |
W11S-30×4000 | 4000 | 30 | 25 | 590 | 290 | 500 | 45 | 22 |
- Q:What are the advantages of cement tile machine?
- the use of advanced original, preferably configured. PC, machine, electricity, liquid, gas, integrated control, automatic control. Change the traditional molding machine "guide sleeve" as "four pole" precision positioning, machine performance is more stable and reliable, productivity, higher yield, more than similar foreign product level.
- Q:The processing method of the tile machine
- Replace or repair the oil pump to improve the cooling system. Use a good hydraulic oil with a good viscosity. The pump speed is too low: the coupling or motor is faulty, the adjustment is not correct or the component is damaged: the pressure is adjusted incorrectly, the relief valve is damaged, the tank seal is leaking, adjust to the correct pressure, replace the relief valve, replace the seal or the cylinder.
- Q:Analysis on the Problems of Cement Shade Machine
- Pan alkali base water, alkali or salt content is too high, the water vapor will bring out the salt and the bottom of the film or surface precipitation; tile body alkaline, in the water after the alkali will be discharged through the pores, the formation of small bubbles. Remove all the affected and the loss of adhesion of the film, to be fully dry tile body, treated with oxalic acid and washed with water, dry and then brushing; follow the construction specifications, do grass-roots waterproof, to ensure that the substrate conditions meet the construction requirements. Gloss uneven uneven base layer is not uniform, the adsorption of the film is not high; film thickness is not uniform; the same side using different construction tools; the same side using different batches of products.
- Q:What steps are required during the installation of the cement tile machine?
- Board installation and commissioning: the board and the plate machine board axis, along the axis direction adjustment board machine so that the board machine in the hanging board down when the tray does not collide with the board, adjust the board lift Induction switch position to determine the number of yards of brick, up to no more than 3 board.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
W11S NC Plate Rolling Machine,roll plate bending machine,metal rolling machine
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords