• Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality System 1
  • Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality System 2
  • Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality System 3
Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality

Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

1.Description of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality

Steel Coupler Rebar Steel Tube Made in Heibei China with High Quality

2.Advantages of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality : 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q:I got my scaffold piercing 6 days ago, with titanium, and it was fine until yesterday.I had a couple of nights out and might have knocked it a few times, but yesterday it was swollen, red, throbbing and very painful. There is no liquid coming from it. It seems to have got worse today.I have been following the aftercare advice and cleaning it several times a day with rock salt solution and (up until yesterday) savlon antiseptic spray. Is it just irritated or is it infected? How long should I wait before I go to the doctor? If it is infected, will I have to take it out or just take antibiotics?Thanks!
It's irritated. If it was infected, it would be oozing green or yellow gunk:) If it gets to that point, go to the doctor. Until then, just treat is regularly with salt solution:) Hope this helped!
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
A set of how much money a day, of course, there are some monthly price calculation
Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
my experience was easy and fast. it was the next day waking up that kills you! keep in mind that its thick cartilage, but it is really worth it. you'll get used to it by like day 3 or 4 but and tug or pull will remind you of the pain. i recommend it!
Q:What are the general specifications of bowl buckle scaffold?
In fact, the conventional bowl buckle scaffold is made of 48 Q235 carbon steel pipe processing, pole specifications are 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.4m, 3.0m; crossbar specifications are 0.6m, 1.2m, 1.5m. The price of any product is determined by its consumption of materials and processing costs
Q:i already found the force in rope 2 but im not getting the force in rope 1.
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
Don't forget with fire and flourescent tubes surrounding the ring
Q:For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
She was only on it once officially but there are several appearances in the book.
Q:I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords