Pump Truck 85km/H 66m Long Boom Concrete

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Pump Truck 85km/H 66m Long Boom Concrete 

Product Details

Basic Info.

Model NO.:SY5631THB 660C-8

 

Type:Concrete Pump

Machining Process:Welded Molding Machine

 

Feeding Height:as Required

Certification:ISO9001: 2000, CE, BV SGS etc

 

Condition:New

Color:as Required

 

Model:Sy5631thb 660c-8

Vertical Reach:66.0m

 

Horizontal Reach:62.0m

Reach Depth:44.6m

 

Unfolding Reach:47.0m

Emission Standard:Euro III

 

Engine Power:405kw/1800rpm

Max. Speed:85km/H

 

Concrete Theoretical Output:Lowe Pressure 180 M3/H

High Pressure:125m3/H

 

Export Markets:Global

Additional Info.

Trademark:YU JIE

 

Packing:Nude Packing

Standard:CE, ISO, SGS, BV

 

Origin:Henan, China (Mainland)

HS Code:8413400000

 

Production Capacity:500 Sets / Year

Product Description


ModelSY5631THB 660C-8
Vehicle ParametersLength17605mm
Width2500mm
Height4000mm
Dead Weight63000kg
Boom & OutriggerVertical Reach66.0m
Horizontal Reach62.0m
Reach Depth44.6m
Unfolding Reach47.0m
1st Section   Length13400mm
Articulation90°
2nd Section     Length11000mm
Articulation180°
3rd Section   Length10900mm
Articulation180°
4th Section   Length13100mm
Articulation260°
5th SectionLength8155mm
Articulation180°
6th SectionLength5460mm
Articulation90°
Turntable Rotation Angle±360°
Outrigger Spread Width -- Front13755mm
Outrigger Spread Width -- Rear14870mm
Pumping SystemConcrete Theoretical Output      Lowe Pressure180 m3/h
High Pressure125m3/h
Theoretical Pumping Pressure      Lowe Pressure8.2 Mpa
High Pressure12 Mpa
Max. Strokes Per Min          Lowe Pressure29 times/min
High Pressure19 times/min
Delivery Cylinder Diameter260mm
Delivery Cylinder Strokes2100mm
Hydraulic SystemOpen Loop
Hydraulic System Oil Pressure34 Mpa
Oil Tank Capacity900 L
Water Tank Capacity840 L
Pipeline Size125mm
End Hose Length3m
End Hose Diameter 125mm
ChassisChassis ModelBENZ Actros 6555 12×6
Engine TypeOM502LA type V8
Engine Power405kW/1800rpm
Emission StandardEuro III
Capacity of Fuel Tank400 L
Displacement15.928 L
Max. Speed85km/h
Brake Distance≤10m/30km/h

Pump Truck 85km/H 66m Long Boom Concrete

Pump Truck 85km/H 66m Long Boom Concrete


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Winter concrete pump pipe Zeyang insulation Yeah?
If the temperature is low (for example, minus 15 ° or less), you need to use mineral wool was wrapped with plastic cloth.
Q:Is it easy to use fine stone concrete pump?
, High-efficiency construction equipment; fine stone concrete transport equipment for construction, roads, mines and other works of fine stone concrete or mortar delivery, installation of jet accessories do spray pump for concrete, mortar, refractory materials and landscaping soil spray throwing.
Q:Is it easy for small concrete pumps?
because the equipment manufacturers are now more than 10 years of production experience
Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
The net residual value is the portion of the value of the residual value minus the fixed asset clean-up fee payable after the expiration of the use of the fixed asset.
Q:Can the tower crane be filled with concrete pump tube?
(9) ribs and wire rope direct contact without protection measures are not allowed to hang; (10) six or more strong winds are not allowed to hang.
Q:What is the treatment of concrete pump block
Into the hopper into the 15 ~ 30L cement slurry, repeated, forcing the channel to open.
Q:What are the requirements of the concrete pump?
6, in the concrete pump within the scope of operation, shall not impede the resistance, high-voltage wire, at the same time have to prevent high-altitude falling objects measures.
Q:How to operate concrete pump
The safety valve of the hydraulic system shall not be adjusted arbitrarily.
Q:Building concrete pump is how to bulk cement (concrete) to the high
The concrete conveying piston connected to the main cylinder piston rod is self-priming in the conveying cylinder. The concrete in the hopper is sucked into the conveying cylinder through the suction port of the valve under the action of the atmospheric pressure and the stirring of the stirring blade.
Q:What is the use of micro-concrete pump?
Applicable to the construction of railway, highway tunnel, culvert, culvert, culverts, bridge holes and other structures, large-scale group building construction column pouring, including those water conservancy projects, hydropower projects, slope support, underground construction operations, the basis of filling works

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range