Lifting Anchor Forged Straight Type Long Design II

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Specification:

Material: Carbon Steel, Forged

Finish: Self Colored, or Galvanized

Packaging: carton, then on pallets, or as customers' requirements

Stocks: we have stocks for regular sizes

Warning: never exceed working load limit


2. Products available:
Swift lift lifting eyes are used with the swift lift anchors to lift, handle and place precast concrete elements

3. Primary competitive advantages:
1. More than 10 years 4 years focus on building material manufacturing
Prompt delivery lead time within 25 days after confirming order
2. Eathu's products are enhanced by the factory QA and quality control checks during the production, if necessary each order can be send out with a certificate referring back to test
3. OEM/ODM capability: more then 10 years experience


4.Packaging and delivery:
Packaging details: goods packed in cartons and then on the pallet
Delivery detail: within 25 days after getting payment

Small Orders Accepted

Brand-name Parts

Country of Origin

Green Product

Guarantee/Warranty

International Approvals

Market:

Asia

Western Europe

Australasia

Central/South America

Eastern Europe

Mid East/Africa

North America


FAQ:
 
Q1: How long about delivery time  Concrete Lifting  anchors  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete lifting  anchors?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 


Lifting Anchor Forged Straight Type Long Design II

Lifting Anchor Forged Straight Type Long Design II


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
In the process of pumping concrete, with the increase of pump pressure, pump impact force will force the tube to move back and forth, this is not only the loss of pumping pressure, and connecting parts between the pump in shock and intermittent tension state, can lead to premature damage, and rubber pipe cement slurry overflow, therefore must be fixed the pump
Q:If the concrete pump valve jam how to judge and deal with?
When the pipe is blocked, the pump shall be taken repeatedly, reversing the pump, and gradually pump the concrete at the pump's outlet back to the hopper and mix again
Q:What are the preventive measures for concrete pump?
When installing and designing pipes, avoid 90 as much as possible. And S shaped bends.
Q:How does the concrete pump work?
When the pump is in place, support the leg and keep the body level and stable. When feeding with a distributor, the body shall not exceed 3 degrees of inclination
Q:What kind of concrete pump truck?
The advantage is that the occupation of the site is relatively small. Relatively low cost. But the labor intensity of the workers is relatively large. The advantage is that the operation cost is low. If the high-pressure pipe operation is used. The conveying height is relatively high
Q:What is the washing process of the concrete pump pipe?
Connect the reducing pipe and close the discharge door. Pour water directly into the hopper.
Q:How can the concrete pump be installed and used?
Evacuate the surrounding area while dredging the pipe. Remove pipe before cleaning should be taken to counter method, clear pipeline pressure. The pipe mouth is not allowed to disassemble
Q:How to operate the concrete pump?
All the bolts of the pumping unit shall be fastened, and the pipe joints shall be tightly sealed. The protective devices shall be complete and reliable
Q:What are the causes of pipe blockage in concrete pump?
Therefore, in the JGJ/T10-95 "concrete pumping construction technical regulations," stipulated that the sand through the 0.315mm sieve shall not be less than 15%.
Q:What are the types of concrete pumps?
According to the structure and use of divided into drag type concrete pump, car pump and pump car

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range