LED Tube 10W, SMD2835,48 PCS CHIPS,6000K, Milky Cover,2 feet LED T8 Tube With FA8 base ,G13

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
Supply Capability:
200000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1, Base for choice: G13/G5/FA8/FA6

2, The base is rotation/non-roatation ,be chosen

3, Free laser print, silvery label, manual

4, Lead time: 15-20 days

5, Cover for choice: transparent / milk/ stripe

6, Aluminum alloy back + PC cover

7, We also can quote you precise FOBShenzhen price as per your qty

8, Ra can be 72 or more than 80

9, Capacity can be AISHI/Rubycon

10. MOQ is 2000pcs


***Isolation driver for safety use or not isolation for choice

***High power factor more than 98% ,

***If one pcs chip dark, all the left chip still light

***TUV CE test passed or not for choice

***over current protection,

***lower power but high efficiency ,

***Warranty time is 3 years or 2 years for choice

***No flicker

China factory 40W 8 feet LED T8 Tube with FA8 base ,G13

1.New 2835 SMD as the lighting source,100lm/W,normal CRI is more than 75Ra,the big value is 80Ra, different requirements to meet the different requirement. High lumen.

2.Two ends power supplier and single end power supplier can be chosen.

3. Voltage:100-240V AC / 110-120V/ 85-265V

4.Luminous Flux: 4400lm,equal to 2*48W traditional fluorescent T8 tube.

5.Micky/Transparent cover can be chosen.

Product dimensions:

32.9 cm,35.7cm,43.7cm,60cm,90cm,120cm,150cm,240cm ( 8 feet)

Specification for whole series


Eco-friendly replacement of traditional fluorescent T8 tueb

40W LED replace 2*48W fluorecent tube,large enegy saving.

SMT machine to mount LED chips.

100%SMD Check

100% product aging and Check


Package of  China Manufacturer 40W 8 feet LED T8 Tube with FA8 base

Order Process

1. We Win the inquiry from You
2. We Send price list according to your requirement
3. You Select products and we send you samples
4. You confirm the samples and send a purchase order
5. We send you proforma invoice
6. You arrange the payment
7. Production and shipping arrangement
8. Delivery

Sample Policy

Samples are available in our company, we know only after sample order, our cooperation can go a further step. Normally We send free samples if the samples are not up to 10pcs. Anyway we can guarantee is that we can refund the samples cost accordingly from the formal orders. And we send samples by DHL, Fedex, TNT or UPS, shipping with customers' own account is acceptable. Lead-time is 3-5 days.

Payment Term

1. T/T in advance (Telegraphic Transfer) for the following:

1) New customers
2) Small orders or sample orders
3 )Air shipments
2. Deposit 30%, then T/T balance before original b/l, for reliable customers
3. Irrevocable L/C at sight, for old customers and volume orders.

Warranty Service

We guarantee the best quality products to our clients.Our warranty is one year for CFL and 2 years for LED products, liability under this waranty is limited to the replacement of any product found to be defective under normal use and with factory specifications.


We adhere to the marketing and sales service idea and devote to an extreme customer satisfaction. We insist on market oriented, customer focused, and all-around, prompt, considerate services. From the foundation till now, we are specialized in OEM and ODM service for our customers. For clients of OEM and ODM, we endeavor to make original design, consummate quality, favorable price, competitive after-sales service, and steady, efficient delivery, so as to meet customers ' special requirements and help customers enhancing their core competition and retaining consumers . We sincerely look forward to the cooperation with you someday in the future!

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to detect the good and bad of the fluorescent lamp
If you measure the resistance at both ends, it's not bad
Q:Do the fluorescent tubes save electricity for 10 minutes, or do they save electricity in a split second?
If you turn on the lights for a second, it won't take more than 10 minutes. When any lamp is lit, there is a loss to the filament, so a temporary turn off the light is unnecessary.
Q:How do you know whether a fluorescent tube is good or bad
There is a small filament in each end of the normal daylight lamp, and the two feet on each side of the lamp are interlinked with the multimeter (only very small cold resistance). Working principle is: making after vacuum tubes when filling the silver (mercury), a small drop of water on the walls painted with fluorescent powder, the bulb is started, at the ends of the filament after heating, mercury evaporates into gas, gas is ionized conductive lines into loop, gas release a large number of ultraviolet (uv), at the same time by the ultraviolet radiation fluorescent powder from visible light. In addition, when after the lamp aging on both ends of the filament evaporation guide to black on both ends of the tube, the tube sometimes no broken cannot use the filament lamp to glow (so).
Q:The LED fluorescent tube plus the ballast why is it still going to press?
The ballast is not the condition that the voltage is raised, and when it is energized, the generator switches in the circuit, which is connected by a neon discharge tube with a capacitor
Q:What is the cause of the lights after the led fluorescent lights are turned off
The second the problem is less But the most easy to test leakage is chip Or a chip resistance capacitance are stored This can be got, through testing machine performance
Q:LED daylight tube is the minimum of the W, the maximum number of W
Hello, the LED tube is not currently fixed, the smallest is 4W and the largest is 25W
Q:Do not have the fluorescent lamp of actuator, how to change LED lamp tube?
Want to change LED lamp to match, the piece of fluorescent lamp is not usable.
Q:The circuit board in the LED fluorescent tube, what's the name of the component?
Have a what ah, whether to the power supply circuit, or light board, if do the power, you don't know now components, estimate for would you don't, schematic diagram, you seek me, send me zhang is out of date, don't mind, the new product is company secrets, if you want to power supply, it is good to look for me directly
Q:What does LED light tube integration mean
The integral whole cannot be removed (including lamp shade, LED lamp bead, constant current source, lamp tube support), directly plug in the electric light.
Q:Is a three-male LED fluorescent lamp? How the quality?
Mitsuo LED bulb, all is by the generation of processing products LED professional production enterprises, from mitsuo buy many, you can increase the cost of quality are ok, but I still suggest you still looking for a professional do the manufacturer of LED lamps and lanterns, will reduce a lot of cost for you!

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range