Led Christmas Decorations Beer Bottle
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 100000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Products Specification Sheet | ||
1 | NAMEChristmas decorations | Plastic LED Beer Bottle |
2 | Size | Height: 11.2cm |
3 | Material | PS / PP |
4 | Colour | Any colour available |
5 | LOGO | Customized Silkscreen Printing / painted Available |
6 | Usage Details | decorations |
7 | MOQ | 5000PCS |
8 | Lead Time | 20~30 days after samples approval |
9 | Capacity | 100, 000pcs/month |
Product Show:
Quality Control
Delivery
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q: CREE semiconductor lighting pay no
- The month payment last month wages can be, but Kuayue is illegal; if the company owed wages, workers can go to the labor supervision by the labor inspection brigade brigade complaints, the employing units ordered deadline for payment of wages, fails to pay, have to pay compensation.
- Q: What are some good suggestions for plant energy saving lighting modification?
- the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
- Q: What are the main technical measures for the implementation of energy-saving lighting?
- The most basic principle is that different light sources should be chosen according to different places.
- Q: Building lighting in lighting, lighting should pay attention to what details?
- Like the direction of lighting, we should design a particular direction as the main direction of view in the design.
- Q: In the application of the following electrical appliances, what is said is incorrect
- Are connected in series between small color bulbs B, on the edge of the road, so the option B either.
- Q: What are festivals fireworks?
- With the development of science and technology, fireworks and fireworks have become a subject.
- Q: The sign and meaning of energy saving lamp
- the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
- Q: The problem of intelligent lighting control
- You can use this loop design as you say. It may be inflexible and how to switch. Is it an artificial control switch? The circuit loop design is too complex, and there are some problems in the subsequent transformation and maintenance
- Q: Colorful lighting, okay?
- Lighting is a brand new resplendent with variegated coloration, in 2013 I bought the resplendent with variegated coloration can also feel, light, I go there to buy a house in the decoration lamp this year,
- Q: What lamps or lighting energy-saving schemes are available for underground parking?
- I think you can go to Shenzhen Rui Rui look
Send your message to us
Led Christmas Decorations Beer Bottle
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 100000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords