Led Christmas Light Of Blue Color For Decoration
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 20000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Wire material | Copper wire, rubber wire |
Wire colour | White/black/green etc. |
Standard item | 100LED, 200LED, 300LED and so on |
IP Rating | IP20, IP44, waterproof |
Bulb distance | About 8cm ,10cm etc. |
Lifespan | More than 50,000hours |
Application | Shop, hotel, park etc. |
Note:
1. Indoor and oudoor using
2. Turn off the power before installment, don't touch the surface of the lights when light on
3. Please make sure using in the normal environment
4. To avoid using nearby the hot or heat source place, where has the corrosive gas.
5. Make sure the installment place could afford 10 times of the weight of light.
6. Installed position must be no shock, no fire hidden danger
7. Do not touch or/and knock the product body during working
Product Show:
Quality Control:
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q: CREE semiconductor lighting pay no
- Labor law fiftieth: wages should be paid in monthly currency to the workers themselves. No deductions or unpaid wages shall be withheld for any reason.
- Q: What are some good suggestions for plant energy saving lighting modification?
- the LED lamp replacement energy-saving fluorescent lamp, energy-saving lamp can reach more than 75% led
- Q: What are the main technical measures for the implementation of energy-saving lighting?
- The measures of lighting energy-saving design usually have the following: first, the choice of lighting methods.
- Q: Lighting line connections?
- The characteristic is that the current flowing through one component flows through the other at the same time. For example: small lanterns in the festival. In the series circuit, the closing switch, the two bulbs simultaneously emit light, and the switch is switched off, and the two bulbs are extinguished, indicating that the switch in the series circuit can control all the appliances.
- Q: Do you want city lighting?
- roads and bridges, airports, railway stations and ports, rivers and water landscape, places of historic interest and scenic beauty, and advertising signs and Commercial Street, city municipal facilities such as landscape lighting, its purpose is to use the light lighting objects to reshape the landscape, and organically combined into a harmonious picture at night, spectacular and unique, in order to show a city or region image of the night
- Q: In the application of the following electrical appliances, what is said is incorrect
- C lighting circuit, the lights and other electrical connection between are parallel, so the option C with B.
- Q: What are the main points of power distribution and lighting energy-saving supervision?
- The heat transfer coefficient, shading coefficient, visible light transmittance and the dew point of insulating glass should be in line with the design requirements.
- Q: Do the statutory holidays allow schools to assign homework to students?
- The forty-sixth article states: "citizens of the People's Republic of China have the right and obligation to receive education.
- Q: About the brightness of LED lighting
- The first is the internal circuit problem. 1 Section 7 should use constant current drive circuit.
- Q: How to use electric car storage battery and energy saving lamp to produce street lamp
- Battery car battery series voltage, battery voltage and battery charge used vary greatly, in order to make the power supply voltage regulator circuit lamp will not be too complicated, so to the battery lighting device power supply voltage should not be too high, with a 12V battery to supply it.
Send your message to us
Led Christmas Light Of Blue Color For Decoration
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 20000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords