Large-sized double masts aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Double large aerial work platform series
There are three kinds of highly choice:
There were high in the collection of GTWY-12, 14, 16, the highest working for 18 meters high.
Using high quality aluminum alloy material system, design, and a strong security,
Wide platform can load in two people and tools work, the more effective and safe.
advantages
-the highest degree of work for 18 m
-lightweight design, large when converted by general channel, thou shalt not go into the elevator.
-platform area: 183 x70cm
-have matching tumbling frame
-the AD/DC power supply
-hydraulic parts imported the international first-class original set of hydraulic pump station for power supply
-particularly strong mast system, increase the stability
-with a sudden stop switch to prevent wrong operation
-in the situation of power is another manual valve has dropped
accessories
-alarm device
-customized platform
-AC or DC power supply
-AC or DC hybrid power supply
Technical parameters:
CODE | GTWY9-Ⅱ | GTWY10-Ⅱ | GTWY11-Ⅱ | GTWY12-Ⅱ | GTWY13-Ⅱ | GTWY14-Ⅱ | GTWY-16Ⅱ |
Work height m | 11 | 12 | 13 | 14 | 15 | 16 | 18 |
Platform height m | 9 | 10 | 11 | 12 | 13 | 14 | 16 |
Carrying capacity kg | 272 | 272 | 272 | 272 | 272 | 272 | 272 |
Storage length m | 2.00 | 2.00 | 2.00 | 2.00 | 2.00 | 2.00 | 2.00 |
Storage width m | 0.80 | 0.80 | 0.80 | 0.80 | 0.80 | 0.80 | 0.80 |
Storage height m | 1.99 | 1.99 | 1.99 | 1.99 | 1.99 | 2.78 | 2.78 |
Work platform size(m) | |||||||
Platform length m | 1.80 | 1.80 | 1.80 | 1.80 | 1.80 | 1.80 | 1.80 |
Platform width m | 0.69 | 0.69 | 0.69 | 0.69 | 0.69 | 0.69 | 0.69 |
Guardrail height m | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 | 1.1 |
Supporting leg size AxB | 2.20x1.84 | 2.20x1.84 | 2.25x1.97 | 2.35x2.21 | 2.70x2.17 | 2.82x2.36 | 2.90x2.50 |
Distance between platform and wall m | 0.19x0.58 | 0.19x0.58 | 0.22x0.64 | 0.51x0.80 | 0.45x0.74 | 0.51x0.83 | 0.55x0.95 |
Voltage(v)ACXDC | 220v/12v | 220v/12v | 220v/12v | 220v/12v | 220v/12v | 220v/12v | 220v/12v |
Electricity machine pressure kw | 1.5 | 1.5 | 1.5 | 1.5 | 2.2 | 2.2 | 2.2 |
Raise/drop speed m/s | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 | 0.18/0.30 |
Machine-weight kg | 680 | 735 | 780 | 780 | 848 | 900 | 980 |
- Q: How does the table in the middle of the tatami mat go up and down
- Tatami lifting table, still have certain technical content of the installation, general to famous tatami custom manufacturers (such as: appropriate PiaoSen furniture customization) give you installed! If it's not installed, it's usually a small workshop, and it's recommended that you find a professional to install it
- Q: What is the phenomenon of the worker's transport of wood using a lift
- Imobile elevator accessory device can be configured for any combination, such as lifting capsules can be used with the inward and outward transportation equipment, make fully automated conveying process, operators need not enter the elevator, so as to ensure the personal safety of operators, and can realize the goods transport between floor, to improve the production efficiency; Electrical control mode; Work platform form; Dynamic form, etc. Limit the function of the elevator to achieve the best use effect. Imobile elevator optional configuration of hydraulic power, convenience and the surrounding the lap joint of frame, roller rolling or motor, prevent pinches safe touch, organ type safety guards, moving or motor rotary worktable, hydraulic flip table, to prevent falling elevator safety support bar, stainless steel security guard network, power system of electric or hydraulic elevator walking, mesa of ball. A stationary lift is heavy in weight. It's not affected by the environment.
- Q: Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
- There are four of them, four of them. See the white climbing wall outside the elevator? Find a way to burst open a hole in the iron wire and climb to the fourth gear. There was no order in this gear, four of them were done, and the elevator fell down.
- Q: The characteristic of shear fork platform
- The fixed platform shall be equipped with the requirements of use, and the attached devices shall be configured for any combination such as the safety protection device of the platform.
- Q: What is the price of the hydraulic platform
- Price is not uniform, see what you want to do. We are also on the platform, the price has not been raised.
- Q: How to improve the oil leakage line
- If it's an interface leak, you need to check if the interface is loose and the seal is broken. Or the interface design is not reasonable, you need to improve the interface.
- Q: Can the stepping motor drive the hydraulic platform?
- Are you a driver for this motor? But the normal step motor is only for torque, step Angle, phase number, not for rotational speed; It may be a servo motor or torque motor, and if the speed is low it is the possibility of torque motors. In addition, you can measure the current, voltage or waveform below.
- Q: Operation and attention of electric elevating platform car?
- Non-professional personnel shall not adjust the overflow valve, the hydraulic system of each component is within the prescribed work under pressure, adjust the overflow valve, may lead to abnormal operation of hydraulic system. There are unnecessary injuries to people, machines and objects; Before any part of the hydraulic system, the pressure oil should be discharged before the pressure oil gusts out. E, the corresponding moving parts shall add some lubricating oil to extend the life of the bearing. F, check the oil and oil position of hydraulic oil. The platform rises all the way. In this position, the hydraulic oil should be 40-50mm above the bottom of the box. If the hydraulic press is dark, sticky or gravel, it is found that 120 # hydraulic oil should be replaced in time.
- Q: There are different kinds of milling machine and vertical lifting machine milling machine
- Horizontal milling machine also can use the above all kinds of cutting tools, but not as convenient vertical milling, mainly can use the rack cutter (mainly side and face milling cutter, flake cutter, etc.). Milling tank, milling plane, cutting etc
- Q: What is the difference between elevator and elevator platform and high-altitude platform
- The elevator will use the motor to reverse the deceleration and pull the cable to lift the basket. The platform, like the high-altitude operating platform, USES hydraulic oil to pressurize or unload the platform. High altitude (pinyin: gao kong zuo ye) refers to the work performed at a certain location on a high level. National standard GB 3608-2008 "high job grading" regulation: "where in the fall for more than 2 m height datum (2 m) to operate the heights of the likely to fall, are called high homework." According to this rule, the scope of the construction industry is quite extensive. When working in a building, operate on a shelf above 2m.
Send your message to us
Large-sized double masts aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords