Hot Sale 9W Tube Light With Ce, Rohs,Ul Aluminium Profile +Pc Cover
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 30 Pieces pc
- Supply Capability:
- 50000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description
1.Isolated driver, over-voltage protection, no flickering
2.Hi-pot test at 2500V voltage, Vibration test, aging test.
3.with CE, EMC,SAA, C-TICK, ROHS Approved.
4.High luminous efficacy up to 110 Lm/w
5.CRI>85, PFC>0.9, THD<14%
Packaging & Shipping
Packaging Detail: neutral package / customized package
delivery time:3-5 working days for samples, 7-15 working days for bulk orders.
Our Services
High Quality !! Short Lead time!! Competitive Price!! OEM And ODM orders are accepted !!
Tube light products application :
Residential Buildings, Home, Office, School, Library, Factory,
Hotel, Casino, Parking Garage, Hospital, Commercial Center,
Supermarket, Shopping mall, anywhere you want
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-15 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q:What is the 1.5-meter LEDT5 daylight lamp tube
- It may also be used at the counter, which is about 1.5 meters in length. Actually, the only thing you can do is change the length when you drop the material. I make the special LED fluorescent lamp, the length is 1.9 meters. 2.5 meters and 2.8 meters, 1.5 meters in pediatrics. Ha ha
- Q:How do the fluorescent tubes fail?
- Basic about $15 a good lamp, spend money to repair it is better to buy a new one, and that no repairability, warranty, will usually give you a new selling
- Q:What is the cause of the lights after the led fluorescent lights are turned off
- The third one is the most common problem of power leakage which is the small current of the power supply or the uncontrollable control
- Q:A set of lamps and lanterns
- Leds are generally refers to the ledT8 tubes, is used to replace the traditional fluorescent tube, in terms of length and the traditional fluorescent tube, with 0.6 m, 0.9 m, 1.2 m of these three specifications. At 1.2m, the price is about 35, and the lightning T8led light tube on Tmall is good enough to see. There is also an led integrated lamp, or led light. This length is the same as the one above, led stents are generally used for new renovations, and the price is more expensive relative to the T8led light tube, because the t8 lamp doesn't have a shelf. Just another light source. Lightning led T5 stents are led and frame, all of which are more expensive than the full set of leds. One meter two is a little over forty
- Q:A 30-watt light bulb can be used for a change of LED lamp
- The fluorescent lamp bracket some trouble, generally in the power of the led lamp is generally in 18 w 9 w, 600, 36 w in 18 w, 1200 long, 30 w words should be in 12 or 15 w, do you want to make sure the tube length.
- Q:The Led is good, or the t5 lamp is good
- Analysis for everybody below T5 tube is good, to a certain extent, can be so analyzing the difference between the LED bulb and lamp, t5LED tubes inside the lamp is LED lamp belt, they are included and contained relationship (t5LED tubes containing LED lights belt) LED lights there is a glue with appearance, this is the only difference between them, but the drops of glue, of course not t5LED tubes of PC material of durable, good protection, pervious to light do not dazzling. The price is relatively bigoted, after all, the material has increased, but for the sake of durability and durability, it is the best choice. Hope can help you, more relevant information can come to our website to know, thank!
- Q:Put on the new light bulb, why the lamp still not bright
- For the electronic ballast, if no response after the power supply the tubes, should first check whether the fuse of the ballast burned, if it is a filament is red, estimation is ballast resonant capacitance breakdown.
- Q:What lamps and lanterns does the supermarket illuminate to use what lamps and lanterns province electric LED fluorescent lamp tube
- The most radar microwave-sensing LED fluorescent lamp is better, and it is always bright when someone is on the radar
- Q:Ordinary lamp tube is replaced by the led for video
- ?tear down everything on the shelf, (one of them is a spin-off: the regenerator, and the inductor, the other is an open circuit board). 2: take the 220V line of communication. Another: LED tube at both ends of two light feet are interlinked, so on the bracket in the line, as long as the wire and zero line in both ends can be respectively, each side there are two shell inside, which one can be
- Q:Can compatible inductance ballast, electronic ballast led fluorescent lamp tube which have to sell?
- I have been able to apply for a patent on the power of led fluorescent lamp which can be compatible with inductive ballast, electronic ballast and direct ac. The loss power of electronic ballast or inductor is about 1W (15W output power).
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hot Sale 9W Tube Light With Ce, Rohs,Ul Aluminium Profile +Pc Cover
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 30 Pieces pc
- Supply Capability:
- 50000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products