High Quality 90 Tee with threaded male take off

Ref Price:
$1.76 / watt
Loading Port:
Payment Terms:
TT or LC
Min Order Qty:
1000 watt
Supply Capability:
100000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

High  Quality   90  Tee with threaded male take off1.It is used in industrial fields, agriculture and garden irrigation 2. Beauty appearance.3.Thermal insulation and energy saving.4. Easy installation 5.excellent heat resistance and pressure resistance 6. affordable price

1.Material:Random Polypropylene(Hyosung R200P); 
3.Standard:GB/T 18742.3-2002, DIN8077/8078; 
4.OEM also ok


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the common connecting methods for plastic PP pipes?
The common ways of connecting plastic pipes are adhesive connection, rubber ring connection, welding connection, and mechanical (clamp type pipe fitting) connection. For polypropylene (PP) pipes, there are three common ways of connection, namely, hot wire welding, butt welding and loop flange connection.
Q:What is the difference between a grooved pipe and a lining pipe?
There is no plastic pipe in the groove pipe, and the plastic pipe in the lining pipe is provided with a plastic pipe
Q:Plastic pipe connections commonly used in several ways?
This connection is made in two different ways: one with an eccentric head and the other with a concentric head. The reducing pipe is mainly used for the connection of living sanitary pipe fittings (such as washbasin, bathtub) and drainage pipe fittings.
Q:Water supply and drainage, fire pipeline installation, pipe installation has been included in the quota, if adding the elbow, three links should be the cost of materials, in which the items below?
If the installation fee does not include the words can refer to sixth copies of the quota items corresponding process approach.
Q:PE how about the installation of plastic pipes?
1, pipe connections, the pipe and pipe fittings and ancillary equipment should be checked according to the design requirements, and should be in the construction site for visual inspection, in line with the requirements can be used. Main inspection items include pressure rating, external surface quality, matching quality, consistency of material, etc.. 2, should be in accordance with different forms of interface using the corresponding heating tools, shall not use open flame heating pipes and fittings. 3, the use of welding methods connected to the pipeline, should use the same brand material of pipe and pipe fittings, for the performance of similar, must pass the test, qualified before.
Q:Antistatic flame retardant PE plastic pipe installation?
When installing the pipe, the distance between the two socket flexible connections shall be no more than 3 meters. When the length compensation is needed, the pipe can be completely inserted into the socket and then out of the 10mm. Flexible connections between pipes and fittings can absorb thermal expansion of pipes up to 10mm.
Q:About plastic drain pipe expansion joint?
The setting of the expansion joint of the plastic drain pipe is generally determined according to the requirements of the design document or the type of pipe, the mode of joint and the position of the environment.
Q:What is the difference between plastic pipe fittings and hot melt plastic water supply pipe fittings?
As the name suggests is lining plastic pipe in the pipe wall lining a layer of plastic, for the purpose of internal corrosion of steel pipe, but as a senior sales staff, the deaf ears furnishings still can be divided clearly, pipe lined with plastic for wire, tube wall has plastic layer, but the pipe with a connection, the inner wall of the pipe the plastic layer and the middle layer plastic pipe wall cracks can not reach the requirement of water resistance, a long time will cause the plastic layer and the steel layer from the water can not circulate time wall middle long will breed bacteria instead of water pollution.
Q:The difference between the hot melt connection and connection to electricity
The use of the machine is not the same, fused link using electro fusion welding machine, currently on the market in Tianjin to more hot melt connection using hot melt welding machine manufacturers, more than;
Q:Regarding the connection of plastic pipes and inspection wells, is the flexible connection or rigid connection?
Connected with the manhole brick or concrete pipe or tube, the intermediate layer is connected with the outer surface approach, part of the advance with polyvinyl chloride adhesive in the pipe or pipe fittings with the wall made of coarse and intermediate layer, and then use the cement mortar wall built into the manhole;

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range