• FOTON  20M³ refueling truck System 1
  • FOTON  20M³ refueling truck System 2
  • FOTON  20M³ refueling truck System 3
  • FOTON  20M³ refueling truck System 4
  • FOTON  20M³ refueling truck System 5
  • FOTON  20M³ refueling truck System 6
FOTON  20M³ refueling truck

FOTON 20M³ refueling truck

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
100 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

FOTON 20M³ refueling truckDrive:6X4;Wheelbase:3825+1350;Passengers :3;Maximum Speed:90;Engine Typ:WP10.290E32 EURO Mechnical;Emission:9.726L;Power KW/HP:213/290(2200);Transmission:Fast 9JS119T-B(Q);Wheel and Tire:10+1/11.00R20 ;Others specification:Manual cab lift, airbag seat, manual rearview glass lifter, air conditioner;

Q:Civic vehicle weight
1255-1320KG
Q:Volkswagen new Sharan is the vehicle import it
All imported, is the Portuguese factory production (the public and Ford joint venture factory), glass is Fuyao glass production.
Q:Want to enter around 3000 road vehicles vehicle (difference, but 200) do not put the girls 160 height
Women 's special road vehicles are rarely low - priced
Q:I do not want to buy a car through the 4S shop, and I do not buy a car on the card. All parts of the car can be through OKorder, modified stores, and so a variety of ways to buy, only the body! The body seems to have rarely sold how to buy the body! Note that I want to be new! I want to assemble my own car!
This is not on the road .... If you really want to buy, it is recommended not to buy online It is recommended to go to the auto parts factory this kind of place to see.
Q:That is, the whole car painting about how long it takes to take the car to go. Is it usually paint? Will it be faster?
About a week! Because the store is not just a car, they will come first to! Demolition and equipment one day, bottomed down also have to be based on the degree of body injury, the most time-consuming, until the paint before the step, the general injury is not three days, and then spray paint! The whole car is generally used slow dry paint, hot weather, then half a day, and vice versa! Then polished for half a day! But have to look at the store business, good for a week! Bad maybe three days to finish! I suggest you do not go to a small facade, the efficiency is not high
Q:What is the difference between the price of the vehicle and the LTL?
Hello, on the same city of logistics and distribution, vehicle prices why the price will be lower than the zero parity, it is because the vehicle's single shipments to meet the needs of the vehicle, and a single delivery and delivery costs There is a reduction, and LTL as a ton of goods have a vehicle transport process, and the middle also have transit links, or loading and unloading services, so the price is relatively higher,
Q:Car inspection, vehicle braking and lighting failure, repair what certificate after the need for re-examination?
The braking performance of a vehicle is one of the most important indicators of vehicle safety and is an item that must be checked at the annual inspection. Therefore, in the annual inspection before the need for early warning of the brake system. Brake oil and brake pads are two places where the brake system needs to focus on. Brake oil is too dirty or too high water content will lead to soft brake, brake wear over the General Assembly will lead to decreased braking force and brake noise. After inspection, the corresponding parts of the maintenance so that the car passed the annual inspection.
Q:Car annual inspection, the vehicle is not the standard?
Let you spend money on him
Q:What is the proportion of the car engine to the vehicle cost?
Not more than 20%. Only the cost of production, excluding R & D costs.
Q:How is the painting route required for vehicle painting?
By virtue of their own work experience

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products