External Airtightness Tapes for Sealing Outdoor Structural Joints Self-adhesive Tape
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
External Airtightness Tape can be plastered over and is especially suitable for sealing outdoor structural joints where wall and roof elements are connected to solid structures.
Product Applicant
Applicable for waterproof sealing of door and window, wall gaps in passive buildings, prefabricated buildings, green buildings, etc.
Product Feature
Airtight & Waterproof
Solve Mildew
High Tensile Strength
Complete Bacteria Resistance
Easy to Install
Can be Directly Plastered
- Q: Bathroom first leveling or do waterproof, what is the difference
- Is the first water and then leveling. Home improvement toilet ground specific process practice: 1. The base layer, and which layer with the structural board, with cement mortar wipe. It is recommended to set the floor drain, the grassroots level should be flat and the direction of the leak to the slope. Against the wall and the root of the root should be wiped rounded.
- Q: What is PE waterproof cloth and PVC tarpaulin
- PE tarpaulin, anti-aging, anti-aging, anti-corrosion, light, easy to fold, relative to the PVC tarpaulin, PE tarpaulin cheaper price for the freight yard, the service life will be shorter.
- Q: Can acrylic materials be perforated? How to do waterproof after punching?
- It is best not to drill in the finished product on the screen, if it is absolutely last resort, You can use fiberglass material in the hole position paper;
- Q: Nanning building waterproof material market where
- This depends on what you need packaging materials, and if it is some packaging rope or paper or process raw materials and other different materials to find a different place, generally sold outside the packaging is more like Nanning near the train station Or the trading market,
- Q: Js waterproof coating without powder can brushing
- 5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
- Q: Roof leakage, what materials do the best waterproof
- Treatment is: large cracks available plugging the king, a small crack can be used to fill the glass glue, repair with a wall waterproofing agent, after spraying a few words on it. As the external walls of cracks and cracks need high-altitude operations, the public must ask the professional construction team to deal with, to prevent accidents. Roof leakage what materials: available SBS modified asphalt - polyester film coil, polyester film SBS-3mm, laying the coil. Roof waterproofing membrane, in addition to SBS modified asphalt, there are three EPDM coil, neoprene. Can also use architectural ointment, cement, polyurethane coating. You can also use asbestos net also do waterproof. If the cement roof cracks, I suggest you use cf-2000 efficient composite waterproofing agent. In the concrete like scraping putty scraping 5mm thick again, you can play a waterproof repair function. Can also slot repair.
- Q: Roof for the insulation, Master roof, using two waterproof construction program
- Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
- Q: Developers have done waterproof, decoration house also have to do it
- Secondly, before the waterproof layer may be done in the house decoration, paving tiles or other equipment when the installation was destroyed, so that the waterproof layer is no longer a whole,
- Q: Villa roof leakage what general reasons, what materials to remedy
- Second, if the roof is only the original did not do waterproof, only need to remove the leaky parts of 2 ~ 3cm deep after cleaning, you use asphalt irrigation, and now there is finished asphalt coating, such as sunny day when the treatment will basically not Leaked out. If there is a waterproof layer is too much trouble, to be around a range of waterproof tick, re-do waterproof, do when the attention and the original waterproof junction to do reinforcement layer. There are many ways to deal with leak detection, or to find some professional leak-proof companies to deal with this problem.
- Q: Waterproof material water leakage construction should pay attention to what
- Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.
Send your message to us
External Airtightness Tapes for Sealing Outdoor Structural Joints Self-adhesive Tape
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000 m²/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products