• EPS Purification panel System 1
  • EPS Purification panel System 2
EPS Purification panel

EPS Purification panel

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
60000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

EPS Purification Panel

The specification of China pu sandwich panel for your option
Model CMAXPU/1000-50(50-150)  
The covering width 1000mm
The thickness of steel plate 0.4mm-0.8mm for your option
The thickness of PU layer 50mm,75mm,100mm,150mm
The density of PU 38-42kgs/CBM
The common color White gray, sea blue, red, you can choose other colors
Installation method Horizontal layout, vertical layout
Recommend coating PE, MSP,HDP,PVDF
Recommend plating Hot-dipped galvanized,AZ plating
Recommend steel plate manufacturer Baosteel, Union, Tianjin seamless factory

Plate is made of painted material as the surface material of composite panels, because of its unique dust-proof, antistatic, antibacterial effect, is widely used in electronic, pharmaceutical, food, biological, aerospace, precision instrument manufacturing and research on indoor environmental requirements heavy purification engineering field.

S series polyurethane exterior wall insulation board is foamed and formed at a time through automatic polyurethane continuous production line. Cement base fireproof roll and polyurethane board special for exterior wall thermal insulation are formed on both sides of polyurethane thermal insulation layer.

S series polyurethane exterior wall insulation board system, the polyurethane insulation board is to be bonded onto the exterior wall thermal insulation system of cement base wall by using special bonding mortar.

Performance of DWCPC-S series polyurethane exterior wall insulation board completely meets provisions of the Opinions of the State Council on Strengthening and Improving Fire Control Works (GF[2011]No. 46) and the Notice of Ministry of Housing and Urban-rural Construction on Implementing the Opinions of the State Council on Strengthening and Improving Fire Control Works (JK [2012]No. 16) through testing by national authoritative testing organization and it is composite grade A thermoset exterior thermal insulation material.



Q: What are the benefits of warehouse outsourcing?
the most important point, the modern community widely recognized professional things to a more professional team to operate
Q: What is the third-party warehouse function and responsibility?
Effective use of resources. The use of third-party warehouses is more effective than self-built warehouses to deal with the seasonal production of ubiquitous products in the light, season storage problems
Q: What is the 5S in warehouse management?
5S management originated in Japan, through the norms of the scene, the present, to create a clear working environment
Q: What are the processes required for the company's warehouse management?
Warehousing management, storage management to fill out the storage list, as well as multi-storage product testing to ensure that the quality of storage products and quantity, at the same time in the report to do the appropriate operation.
Q: How can I manage the warehouse better?
to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
Q: What is the relationship between logistics and warehousing?
Warehousing is not a production, not a transaction, but for the production and trading services in a logistics activities
Q: What is the meaning of goods warehousing?
The traditional definition of warehousing is given from the perspective of material reserves
Q: What is the daily work of the warehouse?
Raw materials warehouse must be based on the actual situation and the nature of various types of raw materials
Q: Recruitment of warehouse staff and warehouse manager of the quality requirements?
have a good professionalism, motivated, flexible response, work seriously responsible
Q: How to do a good job Warehouse Invoicing?
Any enterprise can not be separated from the system constraints, only the standardization of all business processes can greatly improve the efficiency of enterprises

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords