• Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency System 1
  • Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency System 2
  • Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency System 3
  • Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency System 4
Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency

Easy to Install and Dismantle Aluminum Formwork System Supplied in China High Efficiency

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
150000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

China SNTO Aluminum Formwork Benefits

1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel. With weight of 26KG/square meter,Aluminum formwork is the lightest formwork for construction, which makes for easy handling, but bearing 60KN/square meter.
2. Various sizes, high accuracy
The design solution is designed with strict structure, with little measurement error and high accuracy, which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used and recyclable value
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can save the swing cost and shorten the construction period.
7. High Efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Independent props system
The gap between the formwork support is totally enough for passing, moving, and pulling.
9. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

 

Q:The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Q:Advantages and disadvantages of climbing frame and floor type scaffold
2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
Q:The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords