• DChines Best Cold Rolled Steel Coil JIS G 3302 System 1
  • DChines Best Cold Rolled Steel Coil JIS G 3302 System 2
  • DChines Best Cold Rolled Steel Coil JIS G 3302 System 3
DChines Best Cold Rolled Steel Coil JIS G 3302

DChines Best Cold Rolled Steel Coil JIS G 3302

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
32 unit
Supply Capability:
434 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Cold Rolled Steel Description:

The raw material of cold rolled steel coil/sheet is high quality hot rolled product, and after pickling continuous rolling, degreasing, annealing,skin pass,slitting and cut to length line etc. Along with it many kinds of new  technology and new process of global cold rolling production have been applied. Therefore the quality of the goods could be guaranteed. The product is widely used in outdoor and interior decoration, furnishing manufacturing, home appliance, automobile etc. 

2.Main Features of the Cold Rolled Steel

• Excellent process capability

• Smooth and flat surface

• Workability, durability 

• Excellent heat resistance performance

 High strength

 Good formability

• Good visual effect

 

3.Cold Rolled Steel Images

DChines Best Cold Rolled Steel Coil JIS G 3302

4.Cold Rolled Steel Specification

Standard:AISI,ASTM,DIN,GB,JIS,JIS G3302 ASTM 653M EN10142

Grade: Q195~Q345

Thickness: 0.16mm~1.5mm,0.16-1.5mm

Width: 1250,600-1250mm

Coil weight:3-12 MT

Coil ID:508/610mm

Chemical composition:

C

Si

Mn

Cr

Ni

P

S

0.150

0.476

11.231

12.50

0.900

0.039

0.010

 

5.FAQ of Cold Rolled Steel 

We have organized several common questions for our clients,may help you sincerely: 

1.How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

2.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

3. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyers advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.

Q: If not then what is the sense of me taking it essay?
yes, your mother operates under the influence of viagra everyday, she used it prior to conceiving you, that is whey you are the pathetic person that you are -
Q: i have this engine on a go cart and i just want to know how much the motor is worth. thanks
England or united states of america of united statesa..??Twelve 12 months previous boiler would decide on a sturdy cleansing and a song up..it may well be ok..The water tank, if I understand what you say, is an electric water heater..? despite if it is it must be getting drained. If the climate are long previous( there are 2 of them) you will get some warm and then cool water. while you're on hand you may replace them your self..They fee approximately 12 to $15 each. they have the two 4 nuts protecting them in or one vast (a million a million/4) +/-hexagon good on it to get rid of it....close OFF the ability, get rid of the wires ( from one) returned out the unit out counter clock clever. placed pipe thread compound on the threads and reinstall. Then do the 2nd..One hours artwork..do no longer screw with the boiler. Ask around for a functional burner guy to do your boiler. In England, i've got faith, the comparable strategies prepare..added explaination: If one element is lifeless the tank won't shelter temp. in case you do one do 2. it is going to keep you attempting to harass shoot the heater. Too complicated to describe...
Q: what do i need to do to servce my petrol garden machinery(mowers,strimmers,hedge trimmers blowers etc)
Drive them down o your local mr.lube, and get them topped up with all the normal fluids. Or hose them down..
Q: I imported several machines some years ago from Japan,Taiwan and China. I would like to know if California sales tax is due on imported equipment.
Sure. It is called Use Tax but is the same rate as Sales Tax.
Q: A piece of machinery valued at $20,000 depreciates at a rate of 9% yearly. How long will it take until it has a value of $10,000? (Express your answer to the nearest tenth.) its not 7.4
A = P * (1 - r)^t 10000 = 20000*(.91)^t 1/2 = (.91)^t t = log(1/2)/log(.91) t = 7.3 years
Q: ...and after about 5 hours I developed a tight chest feeling and pain when I breathed too deep. It went away last night after I took some aspirin and rested, but I am wondering what it might be.Chemicals from the machinery? Glue fumes? (I was using spray adhesive on some items)
There are men and women in this web page who will document others out of natural spite by the way, can I please ask EVERYONE to whinge approximately Violations whilst they aren't warranted.? A lot of men and women had been deleted just lately after operating very difficult to rise up to a degree wherein they are able to ask and reply limitless. If you get violated for whatever that's NOT even virtually being offensive, please document it with the e-mail header harassment through yet another person and state that you don't deserve this violation. Say that it's harassment and also you wish the problem investigated and the REPORTERS account suspended. I can be reporting EVERY one any longer Lets quit the senseless yobs destroying our paintings Just one factor despite the fact that. If you deserve the Violation - take it at the chin !
Q: The project, however, will end after 5 years. If the equipment can be sold for $4.5 million at the completion of the project, and your firm's tax rate is 35 percent, what is the after-tax cash flow from the sale of the machinery?
What formulas have you tried? It appears as though you are just trying to get everyone on here solve the finance problems for you!
Q: i need the jetty construction machinery for jetty construction on the island?
A jetty normally has a piled foundation, so assuming that you have a suitable seabed. Some form of piledriver or water / air jetting device to install the piles. This will depend on their loading requirements. A crane to assist with the decking. For a simple jetty you may be able to use manpower. Some more information about the size of the jetty and its future use would be useful for a more complete answer
Q: being my mind will be wasted in lala land.....with god
It sounds like when you do believe in God it will be too late for you. You won't even think about driving a car where you will be going.
Q: Farm machinery
The part that connects the handle to the club head.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords