Crimping Tool for Cable YQK-70

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
1000 Piece/ pieces per month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description  

Product  name

Crimping Tool for Cable EP-430

Min order

10 Piece/  Pieces

Capacity

10000  piece/ pieces per month

Technical Parameters  

Out  Put  (T)

6

Ram stoke  (mm)

10

Crimping  Range (mm²)

Cu 4-70

Standard  Mould (mm²)

461025355070

Length  (mm)

310

Weight   (kg)

2.8


Packaging & Shipping

Packing

Flexible  package + Wooden crate

Delivery  time

15~20 days  after deposit

Export  market

Asia,  America, Europe, Africa, markets.

Our Services

1.    Reliable Supplier

2.   High  Quality

3.   Standard  Producing Technology

4.   Competitive  Factory Price

5.   Fast  Delivery

Product Picture:



Other more Crimper:









Function description:

1, Crimp witha hydraulic power cable conductor. Close good electrical conductivity, and thermal conductivity is not easy to fall off.

2, Open design, easyto use.

3 ,Double speed device will die quicklyto the pressure over the pressure relay, rise, and then automatically convertedto low speed, in the completion of thecrimping process is both time and effort.

4,Crimping head can freely rotate 180degrees. Can work in a narrow place

5, Built in pressure regulatingvalve, whenthe pressure reaches the set maximum pressure automatic pressurerelief, toolsto prevent

overvoltage.

6, Glass fiber operating theinsulating rod, toprevent accidental electric shock.

7, Packaging with beautifuland practical integrally molded plasticbox.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the building hardware tools?
Cutting hoods, chain hoists, chain hoists, hacksaw, plum wrenches, sliver wrenches, pipe pliers, screwdrivers, wire pliers, hammers, test pencils, Sledgehammer, hammer, pendant and so on.
Q:What are the costs of the tools used to build the project?
The gadget can be counted in the "production tool utensil" fee for the cost of the enterprise management fee.
Q:What are the tools needed for building construction?
Construction of large tools: pile driver, excavator, bulldozer, tower crane, car crane, cargo dual ladder, reinforced butt welding machine, steel forming machine,
Q:What are the three major tools in construction?
General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction site. Mainly for the construction staff to work up and down or external safety net enclosure and high-altitude installation components, said white is the shelf
Q:What tools are required for building hand-painted?
Architectural hand-painted has a different style of focus. Generally divided into the performance of the microphone pen, pen light color performance, color lead performance and pen sketch and so on.
Q:What are the tools for the construction site level?
2 detection class: 100 grid, small hammer, by foot, feeler and so on. 3 generic categories: calculators, safety supplies, etc.
Q:What software is needed in the construction industry?
pkpm, China Academy of Building Research Institute of Architectural Engineering Software is one of the earliest units in the development and application of computer technology in China's construction industry. It is the national industry R & D center, standard editor of the unit, the project quality control center as the basis, strong technical force.
Q:What are the tools involved in building surveying?
3. Total station, that is, all-station electronic rangefinder (Electronic Total Station), is a set of light, machine, electricity as one of the high-tech measuring instruments, is set horizontal angle, vertical angle, distance (slope, Horizontal distance), high difference measurement function in one of the mapping instrument system.
Q:What are the tools and machines needed for building measurements?
First, the level of measurement 1, level 2, the standard scale 3, the difference between the law 4, instrument high law
Q:Now super high-rise building curtain wall lifting tools are usually used which
2, the use of tower crane and high operating electric basket, but you must pay attention to the high operating below the electric basket to set the warning line, pay attention to avoid cross operations.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range