crawler crane XGC180,reliable quality and technology

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ItemUnitData
Basic boomt180
Fixed jibt33.5
Luffing jibt50
Max.load momentt.m1000.8
Boom lengthm19-82
Boom working condition30-83
Tower jib working condition30-85
Fixed jib working condition30-85
Fixed jib lengthm13-31
Luffing jib lengthm20-59
Winch max.single line speed(no load,at 5th layer)m/min120
Boom elevating gear max.single line speed (at 1th layer)m/min2×28.4
Max.swing speedr/min1.5
Max.travel speedkm/h1.3
Grade-ability%30
Ground pressureMPa0.105
Engine output powerkW250
Total vehicle mass(main hook block,19m boom)t175
Single unit mass for transportt37
Single unit dimension for transport(L×W×H)m11.5×3.0×3.3

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:My friend just went to school for heavy machinery (bulldozers, etc..)?
Never heard of that. Given that the hot market in Alberta and shortage of all types of labour, it may be possible but you have to tell your friend about the skyrocketing expenses there.
Q:Navy: Can anyone tell me the daily life as a machinery repairman (MR) in the navy?
I'm guessing doing upkeep on machinery, fixing broken parts ect ect. As for deployments, usually six months every two/three years depending on what boat your assigned to. However, some do go out infrequently and for shorter periods of time(three months on three months off)
Q:What kind of machinery are they talking about?
Anything that could hurt you or others if your reaction time is slowed, or your judgement is impaired - bulldozers, table saws, drill press, crane, threshers, etc. etc. etc. Easier to say machinery.
Q:In law, how many years of depreciation of construction machinery? (excavator)
People's Republic of China Enterprise Income Tax Law Implementation Regulations belongs to the country level legal norms, the provisions of the law as long as the Department has been abolished, according to the execution, not yet abolished, so in 2012 to continue to press the execution
Q:can automated machinery be the blame for unemployment?
Yes and a bunch of mule skinners lost their jobs when the railroads started hauling freight. When automobiles started selling the blacksmiths lost a lot of business. Stage coach drivers went into low demand when passenger trains started running. I have heard that in New York it is illegal for a home builder to install garbage disposal units in new homes. That is to protect union garbage collectors.
Q:Is it safe to shoot an AK-47 without the machinery cover?
Actually yes. The only purpose it serves it has is to keep dust out. Plus maybe some help with the aesthetics.
Q:Should we make all complex machinery illegal?
obongo says things like this from time to time, demonstrating to us what a moron he is. Same goes for you.
Q:Registration process of a construction machinery maintenance plant in Tangshan? What information should be prepared and which departments should be handled?
Sign the rental contract, but also to the tax bureau to buy stamp tax, annual rental rate of 1/1000 of the purchase, such as your annual rent is 10 thousand yuan, tax 10 yuan would buy, attached to the rent contract home, followed by those who need to use the rent contract in place, need to copy the contract a post stamp tax.
Q:if the company introduces new machinery and reduces its direct labour, how is the break even point affected?
Fixed costs (depreciation of machinery) increase, Variable costs (wages) decrease ...
Q:A heavy piece of machinery is raised by sliding it a distance d = 12.5 m along a plank oriented at angle θ = 2?
The trigonometry of a right-angled triangle .. (a) Height = 12.50.sin20 .. .. .. ►h = 4.28 m (b) Horiz.distance (triangle base) = 12.50.cos20 .. .. ►11.75 m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range