Product Description:

Couplers Rebar Steel from Jiangsu China in High Quality

1.Description of Couplers Rebar Steel from Jiangsu China in High Quality:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 

The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.

The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Couplers Rebar Steel from Tianjin China under Good Price

Couplers Rebar Steel from Tianjin China under Good Price

2.Advantages of Couplers Rebar Steel from Jiangsu China in High Quality: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.

3.Available sizes of Couplers Rebar Steel from Jiangsu China in High Quality:



Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.

5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


Couplers Rebar Steel from Jiangsu China in High Quality

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who has external scaffolding construction program
1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
World Wrestling Entertainment has never done Scaffold Matches in it's 5 Decade Histrory. If you want to see Scaffold Matches, go buy tickets to an Independent Wrestling Show. WWE has no interest in hiring Necro Butcher. He doesn't have the Look that they want. WWE doesn't have any interest in New Jack. They've known about New Jack for 2 decades and haven't made any attempts or expressed any interest in signing him.
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
Don't forget with fire and flourescent tubes surrounding the ring
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:What issues need to pay attention to the construction of high-level scaffolding
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q:What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.
Q:is my scaffolding piercing infected/?
Normally if there is an infection it is very very sore, red, warm to the touch, and secretes yellow or green pus. It sounds like you might also be possibly forming a keloid, but most likely it is just irritated. Continue with your sea salt soaks (hopefully thats what your doing) and go down to your piercer and have them check it out if you get too worried about it.
Q:Should i rotate my scaffolding piercing?
Do what the piercer told you to do. If they didn't say and you are concerned, ring them and ask. Personally I would say don't; the fluid that the piercing naturally leaks while healing can cake on the bar and dry into tiny but alarmingly sharp lumps. If you push these into the piercing accidentally while turning it it will really really hurt! They can also damage the newly forming tissue, delaying healing and possibly creating excess scar tissue. The bar will move naturally with the movements of your body anyway within the constraints of (sorry if you're squeamish but I can't put it any more delicately) any crusting around the bar. Just keep it clean and keep hair and face products away from it and it should be great.
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
No, I would use my hammer while I had my workboots on.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range