construction machine Haihong CTX936 wheel loader, cheap wheel loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX950:

• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque   reserve.

•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.

• Steering system provides flexible steering operation.

•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.

•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.

• Bigger driving axle, 4-wheel drive ensures excellent towing performance.

• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.

•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.

• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.

•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.

• Higher dumping height and biggest dumping reach.

• The front loader frame provides good machine stability and stronger structural strength.

• Rational matching parts, superior machine performance and extraordinary operating efficiency.

• Various optional equipments and buckets can satisfy different needs of customers.


construction machine Haihong CTX936 wheel loader, cheap wheel loader


construction machine Haihong CTX936 wheel loader, cheap wheel loader


construction machine Haihong CTX936 wheel loader, cheap wheel loader


construction machine Haihong CTX936 wheel loader, cheap wheel loader


construction machine Haihong CTX936 wheel loader, cheap wheel loader



Technical Specifications of CTX936:

construction machine Haihong CTX936 wheel loader, cheap wheel loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

Our quality ensurance time is 3 months. And our engineers can supply overseas service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you remember Rachel Corrie?
You mean that flag-burning, terrorists supporting girl? Goodness gracious...I out to speak out of tune from my Christian mannerism but she got what she deserved.
Q:When is AMD Bulldozer predicted to be released?
according okorder.com/
Q:If Faith can move mountains why do we use bulldozers, backhoes and dump trucks?
It is literally impossible for a human being in this day and age to move a mountain by faith alone, unless Jehovah, the True God, chooses to send a miracle. He is definitely able to do that.
Q:Flower Thief Averted: The realtor came by the 'beat the bulldozer' project today and?
if you want them, and no one is there, then i would say they are fair game. who cares if it is bein torn down anyway.
Q:Just buy an old Dongfanghong 70 bulldozer, how do you start?
Then the auxiliary engine gasoline into the bulldozer that in the carburetor with the rope on the flywheel around 2 ring pull vice machine started the next foot side machine clutch hand Fang Na handle right pull attention there's no gas add and then the host will slowly start
Q:Which is better, bulldozer or APU? What's the difference?
APU is not a game of fever, it should be the pursuit of power, performance and price balance, and the feel group HTPC is also good.
Q:Today, I will hunt down and kill a Christmas tree. Besides a bulldozer and a 500 HP chainsaw....?
A tape measurer? Wow, bulldozer...someone's extreme
Q:How would you word this properly on a resume?
Employment: Borland Construction Incorporated **/**/2009 - **/**/2010 or (present) street address city, state and zip Job Duties: Everything from general labor, digging with shovels and picks. And demolition using cookie saws jack hammers, then resetting the base too spread blacktop. Then worked my way up to driving the bulldozers, and steam rollers....etc. Skills: Hard worker, dependable, honest, dedicated, etc.... Salary: start $1xx,xxx yr finish $15x,xxx yr You get the idea? That is the way I was taught to do it back in 1990 Hope this helps. Try and find every good thing you can about work experience education, etc. Make a full page of words. everything even.
Q:What is the first thing you would buy if you won the lottery?
A huge house so I can throw an enormous party. You can supply the hookers and illegal drugs.
Q:I need help on this physics question?
It's really tempting to point out that if the road really is a flat frictionless surface, the bulldozer won't be able to apply much force :-) OK, the rocks are all in contact, so the total mass m = 598 + 769 + 311 = 1678 kg From Newton's Second Law, force = mass * acceleration Fa = 1678 * 0.400 = 671.2 N The force required to accelerate the first rock on its own to 0.400 m/s² would just be 598 * 0.400 = 239.2 N So force F12 is the difference between 239.2 N and Fa F12 = (671.2 - 239.2) = 432 N { Check: To accelerate the second and third rocks total mass (769 + 311) = 1080 kg by 0.400 m/s² requires a force = m * a = 1080 * 0.400 = 432 N. ok.}

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range