Concrete Pump Trailer Pump Diesel Engine HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
It is commonly referred to as a line pump or trailer-mounted concrete pump. This pump requires steel or flexible concrete placinghoses to be manually attached to the outlet of the machine. Those hoses are linked together and lead to wherever the concrete needs to be placed. Line pumps normally pump concrete at lower volumes than boom pumps and are used for smaller volume concrete placing applications such as swimming pools,sidewalks, and single family home concrete slabs and most ground slabs.
Main Product Features:
1. Powerful machine adopts DERTZ diesel engine (made in China).
2. Import generator is optional.
3. The high quality hydraulic valves and oil pump use Germen KAWASAKI products.
4. The valve for change-over from high pressure to lower pressure is designed to be easily controlled, which can adjust the condition of the pump easily in accordance with the requirement of job site. Dismantle the tube is not necessary so that it can avoid the pollution.
Product Specifications:
Parameter/ unit | HBT30 |
Max theory Output(m3/h) | 35 |
Max Pumping Pressure(MPa) | 10 |
Hydraulic system type | Open |
Power mode | Diesel engine |
Speed(r/min) | 1800 |
Power(kw) | 56 |
Valve type | S |
Diameter of oil cylinder(mm) | 180 |
High- lowe pressure switching | Yes |
Hydraulic oil tank capacity(L) | 115 |
Hopper capacity(m3) | 0.4 |
Hopper jeight(mm) | 1260 |
Total mass(kg) | 3100 |
Dimension: L*W*H(mm) | 5400/1860/1900 |
Our Advantages:
1.Training Solutions – we develop our people through high impact training. We increase the connective intelligence potential of individuals and teams through practical, solution-focused programs in areas such as innovation, team collaboration, management development, strategic thinking and decision making.
2. Coaching Solutions - we increase leadership potential with performance coaching. We increase the connective intelligence potential of our managers and key contributors, assessing and developing both their cognitive and emotional intelligence's (capabilities) as the latest research, and practical experience, indicates that both are needed to drive sustained performance.
3. Reward Solutions – We reward our deserving people based on performance (we ensure equitable treatment of employees because appraisals are based on result of performance) by providing the necessary incentives. Its components can be a combination of bonuses, a range of appropriate benefits such as International trips, commissions and Stock option incentive plan for management & senior workers.
FAQ:
Q1: How do we guarantee the quality of our products?
A1: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q2: How soon can we receive the product after purchase?
A2: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 30 to 60 workdays.
Q3: If we can produce some Trailer Pump according to customers request?
A3: Yes, we can produce Trailer Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q4: How to make a quick resolution for after service?
A4: OKorder and our manufacture both have overseas branches all-around of world, if necessary, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.
- Q: Winter concrete pump pipe Zeyang insulation Yeah?
- Concrete winter preparation for the day when the minimum temperature below 0 ℃, should take the winter construction measures to prevent the construction of the construction work suffered frost damage
- Q: Whether the concrete pump can pass the height of 3.75 meters
- The concrete pump is retrofitted on a truck chassis, which is equipped with a sports and powertrain, a pump and a stirrer, a cloth, and other auxiliary devices on the chassis.
- Q: How the concrete pump truck is fuel tank?
- The hydraulic oil (transfer oil) drives the piston movement of the other main cylinder (passive cylinder) by connecting the tubing but causes leakage of the oil due to wear. When the active cylinder piston is running to the bottom, the piston of the passive cylinder has not yet run
- Q: Why does concrete pump truck need pipe?
- The successful development and application of the pump pipe is a positive contribution to the low carbon and energy saving and emission reduction of the concrete industry.
- Q: How to choose concrete pump concrete pump
- The length of the boom is 28 ~ 36m concrete pump is a large amount of products on the market, accounting for about 75%. Long-arm concrete pump will become the main model of construction.
- Q: What is the cause of concrete pump blockage?
- To identify the clogging site, with a mallet to plug the concrete mixture at the plug, and then through the concrete pump is anti-pump to eliminate the block.
- Q: What are the standards for the use of concrete pumps?
- The operator (the pump of the concrete pump) shall record the operation of the concrete pump as required.
- Q: Why concrete pump down to play always block the tube
- In addition to pay attention to pipeline laying, there are also in the concrete pouring process should also pay attention to a certain amount of concrete slump can not be too large, 120-140mm on it
- Q: What is the fuel consumption per vehicle per kilometer and the fuel consumption per pump when pumping?
- Mercedes-Benz chassis than the Isuzu expensive, the quality is also considered excellent, but fuel consumption than the bells more!
- Q: How to operate concrete pump
- (10) after the operation, the hopper and the pipeline must be all the concrete output, and then the pump, hopper, pipe cleaning.
Send your message to us
Concrete Pump Trailer Pump Diesel Engine HBTS30
- Loading Port:
- Lianyungang
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords