CNC vertical boring and milling machine Modle:NX45
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model No. | china cnc milling machine | NX-30 | NX-36 | NX-45 |
Capacity | X axis travel/mm | 500 | 600 | 700 |
Y axis travel/mm | 300 | 360 | 450 | |
Z axis travel/mm | 450 | 510 | ||
Spindle nose to table surface/mm | 90-540 | 150-600 | 150-660 | |
Spindle nose to column surface/mm | 350 | 380 | 520 | |
Feedrate | X,Y,Z rapid traverse/M/min | 15/15/15 | 15/15/15 | 15/15/15 |
Max cutting feedrate(M/min) | 10 | 10 | 10 | |
Spindle | Spindle speed/rpm | 60-8000 | 60-8000 | 60-8000 |
Spindle taper/spindle shank | 7:24 Taper No.40 | 7:24 Taper No.40 | 7:24 Taper No.40 | |
Max spindle inner diameter/mm | Φ60 | Φ60 | Φ70 | |
Spindle motor(30 mins,mitsubishi)/kw | 3 | 5.5 | 7.5 | |
Accuracy | Positioning accuracy/mm | ±0.005 | ±0.01 | ±0.01 |
Repeatability positioning accuracy/mm | ±0.003 | ±0.005 | ±0.005 | |
Machine size | Machine height/mm | 1800 | 2260 | 2330 |
Space requirement(L*W) | 2200*2000 | 2500*1870 | 2560*2300 | |
Net machine weight/kg | 2000 | 3000 | 4500 | |
Power requirement/KVA | 10 | 10 | 15 | |
Drive motor/kw | 1./1.0/1.0 | 1./1.0/1.0 | 1.5/1.5/1.5 | |
Control system | Snytec or HNC | Snytec or HNC | Snytec or HNC | |
Worktable | Table size/(L*W) | 600*300 | 600*360 | 700*450 |
Max load on the table/kg | 300 | 300 | 400 | |
T-slot size/mm | 18*3*105 | 18*3*110 | 18*3*110 |
china cnc milling machine Main machine configuration | 1. China cnc milling machine control system: Syntec EZ4 controller From Taiwan. HNC servo motor; |
2. frequency-changing spindle,6000rpm, 7/24 Taper No.40; | |
3. fully enclosed splash guard; | |
4. pneumatic cylinder for unclamp tools; | |
5. screw rod chip removal system; | |
6. metal sheet cover for guide rail; | |
7. work and alert lamps | |
8. cooling system and water tank | |
9. heat exchanger | |
10. auto lubrication system; | |
11. 380/220v 50Hz transformer. | |
12.High speed bearing. | |
13.China cnc milling machine with 4th NC indexing head FK15145 |
- Q:My dad is wanting to know more about the machine pictured here
- Looks like an old bulldozer. My Dad had a bulldozer and they come in all shapes and sizes
- Q:we have one oil refinery. The spare parts which we keep for the repair of machinery can be a part of our inventory or not?
- If you mean part of inventory carrying cost, absolutely not. If fact, you can get in trouble with the SEC if you to report it otherwise.
- Q:The development trend of mechanical specialty
- Zhaopin experts believe that this phenomenon and construction machinery job requirements of higher professional, so most of the recruitment related professional background of job seekers are closely related. At the same time, mechanical engineering and automation expertise is strong, but also prompted some job seekers to choose the skilled workers, the higher technical requirements of blue collar jobs.
- Q:All the chocolate recipes I've seen require some form of fancy machinery. Is there any way of making chocolate without them? Because I want to make chocolate but I don't want to buy anything expensive.
- Making okorder /
- Q:My neighbors just woke me up with extremely loud chainsaws!! Is there some rule about this??
- It really depends on if there is a homeowners association because they usually have lots of rules you have to follow about when you can work and what you are allowed to have in the front yard... Anytime between 8 9am is perfectly acceptable, however it should also depend on the type of work that is being done. Severe stuff like chainsaws and jackhammering for a long period of time should start later and all neighbours should be warned via a note, phone call, or face-to-face interaction. Yet simple yard work like mowing and using a chainsaw to trim some stuff can start as early as 8am. Many people have a strange work schedules that cause them to stray from the typical 9-5pm shift or people have infants or can be sick... if you fall into one of these categories then you have the obligation of telling your neighbour. If they are cool about it and you approach them nicely then they can start later in the morning, but you have to be respectful of their schedule too. Or simply ask them when they plan on using the loud tools so that you can prepare yourself for it. Who knows, they might have plans later and this is the only time they can get the work done! You don't want to start the communications off on a bad foot because this will just create misery for you in the future. But if all else fails, look at your local ordinaces because there might be some sort of noise rules on file that most people are not aware of. Good luck, and remember to look at things from their point of view too! It will help!
- Q:What about mechanical engineering at North Point? Graduate, good job?
- Mechanical specialty is a general major, employment should not be a problem, but the mechanical line is different, the gap is large, so the salary is also very different.
- Q:The mechanic distinguishes himself from the equipment manager
- Responsible for site temporary electrical and mechanical equipment installation (demolition), management, use, maintenance and maintenance, strengthen the demolition units and the demolition personnel, special operations personnel management, strengthen the lifting of foundation construction, equipment installation, lifting and removing nodes, and other key aspects of the management, supervision lifting equipment and temporary electricity management system
- Q:What is an embedded device, and what sorts of office machinery have them?
- A device that has a computer in it (microwave oven, car, mp3 player) is an embedded device. Office machinery? Printers, copiers, alarms (fire, burglar). If you have to use a swipe card to punch in or open doors, there's a computer behind that (it may be embedded, it may be just a PC.) Your phone system almost definitely has at least one embedded computer.
- Q:Machinery has its tools that need to be replaced after 10 years for technical reasons. At the balance sheet, the tools have been in use for 5 years.Explain is there any present obligation and whether provision is recognized or not?If yes then why?
- Question of Inventory precaution.
- Q:Anybody knows what products can be manufactured with this?I need a list of products that can be manufactured with them ...so ....anyone?
- Virtually anything. The CNC technology is only limited by the material put into the machine and the program used to complete the machining process. I have even seen a type of CNC called CUPCAKE that can produce plastic prototyping for anything imaginable. Very cool!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
CNC vertical boring and milling machine Modle:NX45
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Related keywords