Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
2000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CMAX  Self-propelled Boom Lift work platform


1.      why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.


2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.


3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What issues should I pay attention to when removing the galvanized basket?
1, before the demolition of the basket to conduct a comprehensive inspection, record damage. 2. Park the platform on the flat ground and remove the rope and tie down the iron. 3, the power cut off Lida electric basket.
Q:Calculation of engineering quantity of electric hanging basket
According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
Q:What kind of hanging basket can be used for external wall construction?
Material used: toughened glass is a prestressed glass reinforced with good mechanical properties of thermal shock resistance of the glass to enhance the strength of glass or glass through the use of physical surface compressive stress of glass bearing force first offset surface stress to improve the bearing capacity and improve the tensile strength of glass toughened glass has the advantages of two the strength is higher than the ordinary glass several times bending strength of glass 35 times the impact strength of glass is 510 times higher strength and also improve the safety use of safety glass second main advantages of its carrying capacity increased to improve the fragile nature of the toughened glass breaking bad search was acute debris damage extremely reduce the tempered glass heat shock resistance properties is 23 times higher than ordinary glass. Under 150LC temperature changes to prevent thermal breakage while according to the production of tempered glass tempered physical tempered two physical physical tempered glass At present, the widely used and toughened by quenching medium with liquid cooling, air-cooled tempered tempered cooling plate steel
Q:What is a bridge gondola?
2, electric basket in the cable on the repair, maintenance and construction operations, the gondola system according to the cable structure of non-standard production, the basket body is provided with a guide wheel, a walking wheel and a traction wheel, along the cable walking by traction winch. 3. Use electric hanging basket to carry on the maintenance, decoration and construction of the cable-stayed bridge column. In this system, the basket is made into a mouth shape structure to meet the construction requirements around the column.
Q:Basket installation unit qualification?
To more stringent management norms Jiangsu Sheng Zhejiang Province, for example, the height of the operating basket of the normal use of two main categories of qualifications, first, production and production qualifications
Q:Construction basket project whether need expert proof?
The installation must be checked before the basket basket shaped bolt, embedded parts such as U fixed angle bracket for connecting end of the rail vertical bar and U bar shaped buried, the plane and vertical position. To determine the installation position in the basket of steel embedded parts installation accuracy.
Q:Is it illegal for 4 workers on the construction basket?
Safety rules for building production: building materials, equipment (basket, hoist, feed tower, etc.) are strictly prohibited. On the upper hand is serious violation of the law, the conductor should bear all the consequences. Building basket taboo: 1., strictly prohibited in high-voltage power supply area dangerous operations. 2. do not operate on rails or other safety measures and walk on a single wall. 3., strictly prohibit dangerous operation in high voltage power supply area.
Q:How many kinds of basket are there?
The basket mainly has the following several models: a basket, ZLP500: 1) platform length: 5 meters (2.5 meters and 2.5 meters) 2) load: 500 kg 3) motor power: 1.5 kW, two ZLP630 basket: 1) platform length: 6 meters (2 m + 2 m + 2 m load: 2) 630 kg 3) motor power: 1.5 kW, three ZLP800 basket: 1) platform length: 7.5 meters (2.5 meters and 2.5 meters and 2.5 meters) 2) load: 630 kg 3) motor power: 1.8 electric basket: 6 meters. Type 630.
Q:How are the baskets assembled?
Installation organization: hold basket special special operation operation certificate professional responsible for the installation of basket. Before hanging basket installation, personnel must be installed technical explanation.
Q:How to use the hanging basket properly and up and down normally, speed and anti tilt
Elevator is how to prevent the hoisting machine in the operation of wire rope phenomenon, mainly has the following points. Check the power supply of the hanging basket every time before building external wall construction work. Main check whether the entrance of hoisting machine has sundries, cement or granular sundries to enter. If sundries come between the rope driver and turbine, it will cause the sticking phenomenon in the process of hanging basket rising

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range