Bungee feeding machine AWP8.2000/10.2000

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Dual Mast Aerial Work Platform

1KG=2.2LB 1INCH=25.4MM

Model No.AWP8.2000AWP10.2000
Lifting Heightmm800010000
Rated CapacityKg300300
Platform Sizemm1200x6001440x600
Power SourceV220~240220~240
Motor Powerkw0.750.75
Outer Dimensionmm1530x840x19001750x840x1900
Net WeightKg570728

Suit for 1-2 person to work upraised

With 300KG rated capacity

Maximum platform height (optional) :6m;8m;10m;12m

Power supply:Optional single phase AC(default) , DC

Heavy-duty Aluminium Mast

Equipped with an Emergency Stop

Free-maintenance Battery

Lifting and lowering are controlled well by Hydraulic system

Buttons inside of the controlling box are imported from U.S.A.

Conforms to EN292-1,EN292-2,En280

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Machinery Depreciation?
You still treat it as an asset with a value of its original purchase price and under accrued depreciation you show the same (full) amount again, effectively resulting in a zero balance for this item.
Q:What about the title of Mechanical Engineer?
Mechanical engineers enter oneself for an examination condition: Mechanical Engineer: the first qualification examination is divided into basic examination and professional examination. If the basic examination is qualified and meets the registration requirements prescribed in the present measures, it may take a professional examination. After the professional examination has passed, the certificate of mechanical engineer qualification for the mechanical design of People's Republic of China shall be obtained
Q:POLL: would you rather live in a world with TOO MUCH technology, or live a primitive life, without machinery?
Live a primitive life- it's much easier to prevent the crap we create on this earth before it happens than clean it up after we've dumped it everywhere...
Q:how do i find machinery to produce box sealing tape?
Here okorder.com/ You can search their site for the machinery, but I would call them and speak to a salesman instead. Even if they don't have it in stock, they may have a link on where to get it. I would also do a save search on OKorder for tape machinery or something of that nature. The save search service will email you when someone lists your item. I'm assuming you're looking into producing tape to sell.. if you're just looking into cheap ways to seal boxes in your business, then you can get paper tape machines that wet a pre-adhesived tape. It also cuts it to the desired length. These should be available at major office or warehouse supply retailers.
Q:Why is a crane considered a heavy equipment machinery?
Have you ever seen one? Take a good look. Everything on the truck chassis has been beefed up to accept the loads that the crane is used to lift. There are all different size cranes also. Some are designed for much heavier loads than others.
Q:Bachelor degree in mechanical engineering. How about Liu Gong in Guangxi?
Five social insurance and one housing fund, in general, is not high, but also according to the level of pay, if you are just in general is assistant, and Liugong no accommodation (bidding agency), and the school recruit live a month, other subsidies to 250 fast, quite low, now the construction machinery industry downturn downturn, treatment is not good.
Q:how much is a 2007, 13hp central machinery, gas engine cost?
England or united states of america of united statesa..??Twelve 12 months previous boiler would decide on a sturdy cleansing and a song up..it may well be ok..The water tank, if I understand what you say, is an electric water heater..? despite if it is it must be getting drained. If the climate are long previous( there are 2 of them) you will get some warm and then cool water. while you're on hand you may replace them your self..They fee approximately 12 to $15 each. they have the two 4 nuts protecting them in or one vast (a million a million/4) +/-hexagon good on it to get rid of it....close OFF the ability, get rid of the wires ( from one) returned out the unit out counter clock clever. placed pipe thread compound on the threads and reinstall. Then do the 2nd..One hours artwork..do no longer screw with the boiler. Ask around for a functional burner guy to do your boiler. In England, i've got faith, the comparable strategies prepare..added explaination: If one element is lifeless the tank won't shelter temp. in case you do one do 2. it is going to keep you attempting to harass shoot the heater. Too complicated to describe...
Q:What are the major of Engineering Machinery College of Chang'an University?
Chang'an University School of mechanical engineering with mechanical design and manufacturing automation (Mechanical Engineering, highway mechanical construction and management, maintenance and management of expressway, machinery manufacturing and automation, construction machinery, professional direction) of mechanical and Electronic Engineering (Mechatronics and hydraulic transmission and control professional direction), industrial design, traffic construction and equipment of 4 undergraduate the "professional, mechanical and electronic engineering" for the professional national specialty, mechanical design, manufacturing and automation "professional famous specialty in Shaanxi province;
Q:What is better Catapillar or Case machinery?
Driven Cat's in the mines (u/g artic trucks AD45, 55 and 55B, graders, 777 769). Proof of the pudding is in the tasting they say, and all mines are full of Cat gear. Im not sure about Case to be honest, but Cat gear is excellent.
Q:how to calculate the first five months depreciation on machinery?
While the machinery has a ten year life, it will only be used for eight years and then become abandoned. So we first do $512,500 - $0 and then divide by 8 years to get $64,062.50. That's how much depriciation the machinery accumulates per year. Since we're looking for the first five months of accumulated depreciation, we take $64,062.50 and multiply it by (5/12) months. That comes out to $26,692.71.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range