1200kgs one cage with frequency converter building hoist SC120G
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Condition: New
Place of Origin: Guangdong, China (Mainland)
Brand Name: TW
Model Number: SC120G
Rated Loading Capacity(kg): 1200kgs
Hoisting Speed: 0-46m/min,0-63m/min,0-96m/min
Max Lifting Height: 500M
Dimension(L*W*H): 3.2*1.5*2.1M
After-sales Service Provided: Engineers available to service machinery overseas
customized: cage size and color
safety device: SAJ30-1.2/1.4/2.0
rated voltage: 380V, 415V or customized
cage weight: 2000kgs
counterweight: NO
mast size: 650*650*1508mm
Frequency converter power: 30/55/75kw
Structure: painted or hot dip galvanized
Max lifting height: 500m
rack and pinion type: yes
- Q:Mechanical bearings, all types? Roughly
- The basic structure and NU type cylindrical roller bearing inner ring bearing the same, but because of the needle, the volume can be reduced, and can bear large radial load to the bearing without inner ring shaft mounting surface with suitable precision and hardness is used as a raceway.
- Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
- Therefore, the medium carbon steel has the most extensive application in the medium strength level. Besides being used as building material, it is widely used in the manufacture of various mechanical parts. Welding: 1 the preheating is conducive to reducing carbon steel heat affected zone is the most
- Q:What are the details of construction machinery parts in sand casting?
- (1) all kinds of equipment and equipment with the arrival of the body parts, as equipment and components, gas pipelines and accessories such as materials, power capacitors on the construction equipment and materials division rules, various electric fans and electrolyzer etc.. 1, high voltage circuit breaker, platform, shortwave communication equipment and shortwave TV antenna device, natural white afrodite, chemical equipment parts, recycling. For the completion of the building, elevator rails are materials, catalyst, screen (including the box and the instrument has been installed in place, by the design unit to provide manufacturing drawings, unit combination instrument, strengthen the investment in the process of construction and management, and other accessories are materials; non standard equipment, sliding contact line
- Q:Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
- Q:What kind of electrical equipment do you have? What are the main components of each device?
- The utility model relates to a distribution box, belonging to a primary equipment in an electric equipment. Electrical equipment includes primary equipment and two equipment. Primary equipment is mainly power generation, power transmission, transmission, distribution, electricity and other direct generation, transmission and consumption of electrical energy equipment, such as generators, transformers, overhead lines, power distribution cabinets, switches, cabinets and so on. The two equipment is the equipment that controls, protects, measures and so on. Building or general buildings, such as cables, power distribution cabinets, motors, switches, sockets, lamps, air conditioners, electric water heaters, electricity meters, cameras, telephones, computers, etc., are electrical equipment.
- Q:What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
- Q:Changsha Sanlian Building Machinery Fittings Factory
- The company in Changsha Hongdun business online can not find, provided by his address: two Changsha section of Xingsha Economic Development Zone Yuan Ming Road, I checked 114 specially call 12580 to booking the hotel near the road, not the road. Definitely a liar.
- Q:How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
- Q:What are the sectors of machine building and parts processing?
- 1., industry generally refers to its production of similar products, or with the same process, or to provide similar labor services division of economic activities, categories.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
1200kgs one cage with frequency converter building hoist SC120G
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords