Zhongmei brand Inclined Shaft Explosion Door

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Inclined Shaft Explosion Door

Inclined Shaft Explosion Door is mainly used for mining inclined well head . When underground danger, shock waves spread the explosion door, have the effect of release and ease the oblique shock wave wind well.

Product Detail:


Inclined Shaft Explosion Door Brief Introduction

Inclined Shaft Explosion Door is mainly used for mining inclined well head . When underground danger occurred, shock waves spread and open the explosion door, have the effect of release and ease the shock wave in inclined shaft well. 

Inclined Shaft Explosion Door Parameters

No.    Drawing  No.            Specification            
 1      Mark66-375(1)--00    5000×3800 
 2      Mark66-375(2)--00    4500×3550 
 3      Mark66-375(3)--00    4000×3300 
 4      Mark66-375(4)--00    3500×3050 
 5      Mark66-375(5)--00    3000×2800 
 6      Mark66-375(6)--00    2500×2650 

Inclined Shaft Explosion Door Instructions

1.  Draw out ventilation fan with maximum negative pressure of 350 mm water column 
2. No. 7 welded steel pipe in the anti-wind applications, no need to keep during normal working hours 

3. explosion-proof door transportation shall take the necessary measures to prevent deformation 

4. explosion door frame installation should cooperate closely with mining professional, beware of deformation 

5. with the door frame and door leaf, and strive to close the door frame column in the back with rubber to prevent air leakage 
6. the package number 3 hinges lubrication when installation to ensure that the flexible 
7.  all doors should be painted red explosion minium,and then paint black.

Inclined Shaft Explosion Door Installation Requirement & Method

 1. Installation Requirement 
   when installation, in accordance with the installation method, should be straight flat after installation, open and flexible. Then explosion door closed, place the stop lever in the frame on both sides of the fixed frame, and the outer side of the door with sand or soil buried below 10 centimeters.
2. Installation Method : 
  (1) the first finishing and measurement of roadway width and height of the mouth, guarantee the explosion door up with (including) into a whole.
  (2) the two doors flat on the ground, tidy up the middle of the two sealing rubber, use bolt to fix two good, that is to be installed.
  (3) the direction of adjustment to ensure that the explosion door open outward, only then two doors and stand on the wellhead.
  (4) adjust, use wood to fix the whole door.
  (5)  to build by laying bricks or stones wall fixed is designed according to the wellhead.
  (6) the wall after solidification, the explosion door closed, and place the stop lever in the frame on both sides of the fixed frame, and the outer side of the door with sand or soil buried below 10 centimeters, can be normal use.
3  Maintenance Method : 
  (1) Where there is rust knocked off or material at any time shall be painted up.
  (2) Rubber seal if damaged or unglued should be replaced or bonding, sealing strip replacement period is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range