• Walk Through Frames Scaffold System for construction System 1
  • Walk Through Frames Scaffold System for construction System 2
  • Walk Through Frames Scaffold System for construction System 3
  • Walk Through Frames Scaffold System for construction System 4
  • Walk Through Frames Scaffold System for construction System 5
  • Walk Through Frames Scaffold System for construction System 6
Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
10000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Walk Through Frames Scaffold System for construction


Outside Diameter: 1.69" 
Wall Thickness: 0.095" 
Lock: Drop Lock 
1st Lock: 6" from top of frame leg 
Lock Span: 4'

Coupling Pin Hole: Drilled at 45° Angle 
Coupling Pin Hole Location: 2½" from the top of the frame leg. 
Blue powder coating prevents rust and minor scratches.

 

Frame Scaffolding Advantages:
1) Reasonable structure, simple assembly, quick operation, safety & reliability;
2) Easy to carry and operate

3) Wide applications, for both inside and outside construction

Name

Main Frame Scaffolding H Frame Scaffolding

Size

5’x5’

Main Material

Q235

Surface Treatment

powder coating

Color

blue

Certificate

OSHA

Service

OEM Service available

MOQ

one 20'container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request




Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction


Walk Through Frames Scaffold System for construction


Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction

Walk Through Frames Scaffold System for construction




why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .




OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest





Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.
Q:What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
depends how many times have i told you to get off?
Q:What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q:Cells from an animal's muscles are processed with chemicals and they grow. The cells are transferred to a metal scaffold and are stimulated physically. In a few months, you have a big block of meat which can be ground and cooked. What do you have to add? Does this innovation mean the price of meat will become a very minor expense?
Depends on how much it costs to stimulate the growth.
Q:Fastener type steel pipe scaffold composed of which components?
3.3 foot plate3.3.1 foot plate can be made of steel, wood, bamboo materials, the quality of a single foot board should not be greater than 30kg.3.3.2 stamping steel feet of the material should be consistent with the existing national standard carbon structural steel GB/T700 Q235Class steel provisions.3.3.3 wooden foot plate material should be consistent with the current national standard "wood structure design code" GB50005 IIaMaterial requirements. Foot plate thickness should not be less than 50mm, both ends should be set to the diameter of not less than 4mm platingZinc wire hoop two.3.3.4 bamboo scaffold board shall be adopted by bamboo or bamboo bamboo string plate, bamboo; bamboo string amphipodsshouban shouldIn accordance with the existing industry standards "construction of wood Scaffolding Safety Technical Specifications" JGJ 164 of the relevant provisions.3.4 adjustable support3.4.1 adjustable support screw outer diameter shall not be less than 36mm, diameter and pitch should be in line with the current national standard "ladder"Type screw thread GB/T 5796.2, GB/T 5796.3 provisions.
Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q:I would like a scaffold piercing, but my parents aren't going to let me have two cartilage piercings at once. So, can they be done separately, as in weeks apart?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords