Waling-to-bracket holder① Washer plate 60x140 ② Wing nut D15

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
6000 set
Supply Capability:
20000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Used for assembling formwork and bracket.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Which piercing hurts less - helix or scaffold?
Helix will be less painful. It's kind of obvious that it would be a helix is probably one of the easiest piercings you can get I got mine done when I was like 13 and I didn't even flinch getting it done. A scaffold is definitely more intense. After all there are 2 incisions for this piercings so it's gong to be twice as tough. It's sore haling too, the bar is awkward and when it moves it hurts. A helix is far easier :)
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
person above me obviously didnt read LOL. anyways as to your problem you might have to bend your ear a bit while you are piercing it but this mite cause the jewlry to pull forward, you could also go higher up, change the angles or you could do a vertical industrial which would look gud with ur other pericings
Q:Method for inspection of foot hand frame fittings
Or "low pressure fluid delivery welded steel pipe" GBT 3092
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:How old do you have to be to have your hip peirced and scaffolding?
depends on the state.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q:What issues need to pay attention to the construction of high-level scaffolding
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
Q:What are the common rules for calculating the amount of scaffolding works
According to the wall masonry scaffolding (single) vertical projection area calculation with square metre.Scaffolding, without deduction of door and window opening, air ring, vehicle channel, deformation joint area. At the same time, the height of the same building is different, according to the vertical height of the building.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range