• Two-component Polyurethane Waterproof Coating System 1
  • Two-component Polyurethane Waterproof Coating System 2
Two-component Polyurethane Waterproof Coating

Two-component Polyurethane Waterproof Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
50000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Two-component Polyurethane Waterproof Coating Description:

Two-component polyurethane waterproof coating is a kind of two-component reaction gel-type polymer waterproof coating.A division points is made from polyether and isocyanate by polycondensation reaction of polyamine polymers. B division consists of plasticizer, curing agent, thickening agent, coagulant, such as filling agent of color liquid. When using,after a, b, two kinds of components according to certain proportion are mixed, stirring evenly, besmear in the need of the surface of the base construction, formed by the reaction of curing elastic waterproof coating, tenacity and durability.

2.Main Features of Two-component Polyurethane Waterproof Coating:

Waterproof coating elongation, strength, good elasticity

Coating is close-grained, no bubble, no pinhole

Not contain ingredients like benzene, no pollution to the environment

Cold construction, convenient construction

Strong cohesive force, not strong permeability

3.Two-component Polyurethane Waterproof Coating Specification:

NumberTest  ItemIndex
1Solid content≥80%
2Tensile Strength Mpa 1.9
3Elongation at break≥550%
4impervious 0.3Mpa,30minNo crack

4.Two-component Polyurethane Waterproof Coating Images:

Two-component Polyurethane Waterproof Coating 

Q:A complete set of basement waterproof construction program
Second, the basement of the external walls of water leakage construction preparation 2.1 Technical preparation 2.1.1 Selection of construction methods Waterproof engineering is related to the use of the project an important indicator, it is the construction process of a key project, difficult engineering. The choice of construction methods and programs has a direct impact on the quality of construction. The underground wall of the project SBS waterproofing membrane with hot melt method full construction. 2.1.2 before the start of the project, the first organization of engineering and technical personnel to enter the construction site, to understand the situation, to further understand the characteristics of the project to solve the contradiction between the construction technology and the implementation process. 2.1.3 technology before the end of the construction of waterproofing works by the professional foreman in accordance with the construction drawings and the existing national norms require the actual situation of the project to the construction team in writing to the end. The contents include construction site, construction sequence, construction technology, construction level, node fortification method, enhancement site and practice, project quality standard, guarantee the quality of technical measures. And after the field technical person in charge of the strict implementation of the audit.
Q:How does the finished ventilator manufacturer waterproof?
do not play any silicone and tape, to avoid the silicone tape aging caused by leakage hazards. Can be done once and for all.
Q:Villa roof leakage what general reasons, what materials to remedy
First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. First look at the roof there is no crack, the original waterproof layer is not aging, the roof of the original waterproof membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking, and roof On the gutter there is no clogging.
Q:Roof membrane waterproof construction process, what should be noted that?
Four do not: 1 surface can not afford sand 2 surface can not afford skin 3 surface is not crisp 4 does not crack
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
3, according to the hydrogeological conditions and outdoor environment type to take the appropriate level of waterproof concrete.
Q:Rigid (concrete) waterproof roofing shop SBS coil can brush a layer of waterproof paint before?
Third, according to personal experience, SBS membrane waterproof, as long as the quality of waterproof membrane clearance, and in accordance with the requirements of the strict implementation of the implementation, it can be said that the most assured and a roof waterproofing method. Remember: First, the material to cross the border (must be the real polyester carcass), and second, pay attention to the operation carefully in the construction. Just remember these two points, it will not appear too much problem.
Q:Eastern rainbow waterproof how to do
especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
Q:Nanning building waterproof material market where
This depends on what you need packaging materials, and if it is some packaging rope or paper or process raw materials and other different materials to find a different place, generally sold outside the packaging is more like Nanning near the train station Or the trading market,
Q:Waterproof mortar expensive or dry mortar expensive
Cationic neoprene latex is a polymer modified polymer anti-corrosion system. By the introduction of imported epoxy resin modified latex by adding the domestic neoprene emulsion and polyacrylate, synthetic rubber, various emulsifiers, modified latex and other components of the polymer latex.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords