Steel Ringlock Scaffolding of Hight quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of H Frame ScaffoldingDescription 

Presented like a shape of doorFrame-connected Scaffolding includes main framehorizontal framecross bracestage board and adjustable base. In order to display frame with coupler system enough,good performance of stability,firm structure of the whole,easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

Packaging & Delivery

Packaging Detail:in bulk, in bundle, in pallet or as your request
Delivery Detail:10 to 30 days after order confirmation

2.Specifications

1)EN12810,SGS certificate
2)High safety, stable, durable
3)Finishing:HDG,Gal,Paint,Powder coated
4)Real factory


3.Frame Scaffolding product pictures:

Steel Ringlock Scaffolding of Hight quality


Steel Ringlock Scaffolding of Hight quality

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
i heard from people after a year an industrial still hurts and they usually have to take them out
Q:The basic form of external scaffolding
The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:What is the mobile scaffolding materials
. 5 years of surface treatment period, and the use of the elimination period, very close to the larger share of the market share. Determine where you can find the mobile scaffolding, because mobile scaffolding is easy to find, and mobile scaffolding is not too difficult to find.
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:is my scaffolding piercing infected/?
Normally if there is an infection it is very very sore, red, warm to the touch, and secretes yellow or green pus. It sounds like you might also be possibly forming a keloid, but most likely it is just irritated. Continue with your sea salt soaks (hopefully thats what your doing) and go down to your piercer and have them check it out if you get too worried about it.
Q:Questions about Scaffold (aka Industrial) piercings?
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range