Steel Frame Formwork GK120 with Long Time Using for Large Projects

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

Steel Frame Formwork GK120 with Long Time Using for Large Projects

 

Steel Frame Formwork GK120 with Long Time Using for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 Steel Frame Formwork GK120 with Long Time Using for Large Projects

 

 

Steel Frame Formwork GK120 with Long Time Using for Large Projects

 

 

Steel Frame Formwork GK120 with Long Time Using for Large Projects

 

 

5. FAQ of  Steel Frame Formwork GK120

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding Tube Strength?
though that page doesn't seem to be quite complete
Q:Industrial/Scaffold piercing question...please help!?
Sounds like a keloid lump!! I had one on my eyebrow piercing, I went to my piercer and she said rince the area with salt at least twice a day and also get a flannel as hot as you can handle it and press it against the lump. Mine went away after about a week.
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.
Q:Pankou galvanized scaffolding is very beautiful, I would like to ask the material and the characteristics of this shelf
Along with the new Pankou scaffolding erection characteristics of the rapid rise in the rapid support system in how to install?First we look at the popularity of related knowledge, also known as scaffolding, disc type, pin type scaffold, Rhea frame called in foreign countries, according to their use can be divided into two types of formwork support and scaffolding. At present, the domestic application is more common template support, as well as the decoration of the operation of the rack. We use the Tianjin nine Industrial Company Limited production of the socket type scaffold, for example:
Q:A 200-N scaffold is held up by a wire at each end.?
Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:The Scarlet Letter scaffold scenes?
No. Santa doesn't like this movie.
Q:Bowl buckle scaffold theory weight table who has, the distance is how much?
The main structure of the construction of the use of scaffolding scaffolding most of the scaffolding, the vertical pole of the scaffolding is generally 1.2~1.8m; transverse distance is generally 0.9~1.5m.
Q:why the scaffold nned to be inspected within the preceding seven(7) days?
To make sure that it is constructed properly and things haven';t slipped out
Q:Industrial/Scaffolding piercing.?
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range