Steel Cup Lock System Scaffolding in China

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

 

2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

1.High-rise residential, commercial buildings, industrial buildings.

2.As well as special factory supporting design, which includes the general viaduct bridge engineering, tunnel engineering, workshop, elevated water tower, power plants, refineries, etc.

3.Applicable to the flyover, span the scaffolding, storage shelves, chimney, water tower, indoor and outdoor decoration, large-scale concert stage, background frame, the stands, balcony, stair system, the party stage set-up, sports stadium and other engineering.


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

1. Multifunction: According to the specific construction requirements, it can be installed the construction equipment which contains different groups of size, shape and bearing capacity of single and double row scaffolding, shoring prop, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment..

 

2. Efficient: Avoid to use the nut to operate, the speed of installation and dismantle is faster 3 to 5 times than common, workers use a hammer to complete all assignments.

 

3. Strength universality: It takes the common coupler scaffolding steel pipe, which can be connected between coupler and common steel pipe.

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:scaffold piercings! HELP PLEASE!?
well i would cover it up if i were you.....leave ure hair down or something to make it less nnoticable
Q:what pole size diameter will fit over a scaffolding pole?
you will need to measure the scaffolding pole to be sure or take a piece to the store with you.
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q:what is differences between scaffold and scaffolding?
Scaffold is what scaffolding is constructed of.
Q:scaffold/industrial piercing help!?
Depends on where you live- I live in Michigan and the tattoo parlors around here are $25.00 for all peircings above the waist. I dont think Ive seen anywhere for more than that. But if you live in California or Florida, it will probably be more because its a big tourist/spring break spot and a lot of college kids get tattoos/peircings on Spring Break, so they jack up the price of everything
Q:How to calculate the quantity of steel pipe in the support system of the bowl buckle scaffold
According to the bearing capacity of the vertical bar, according to the gravity of the beam and slab, the stress analysis of the horizontal member is carried out
Q:Does scaffolding piercing hurt more than snug piercing?
A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
Q:Specification for bowl buckle scaffold for construction
JGJ130-2001 is the construction of steel tubular scaffold safety technical specifications in the second half of the new version JGJ130-20112011 December 1st implementation
Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range