Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube Made in Tianjin

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3000 pc
Supply Capability:
1000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Coupler Rebar  Scaffolding Galvanized Scaffolding Tube High Quality

1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube Made in Tianjin

Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube Made in Tianjin

2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube: 

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In the Scarlet Letter, how does the scaffold scene free Dimmesdale, Hester and Pearl?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:Who has external scaffolding construction program
See the following table for permissible deviation of steel pipe:Item deviation check tool1 welded steel pipe size (mm) outer diameter 48Wall thickness 3.5-0.5 vernier caliperThe 2 ends of steel tube shear oblique deviation 1.7 feeler, corner rulerThe corrosion of 3 steel tube outer surface depth of less than 0.50 vernier caliper4 kinds of rod end bending L = 1.5m = 5, steel ruler5 pole bending 3m
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:Why won't the WWE hire Necro Butcher and New Jack to work scaffold matches with John Cena?
new jack dont want to work with wwe
Q:What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The question is not a good answer, is to do the building, on the Internet to help check a lot of information, here to share, you can look at the reference price, the price there is no uniform standard, each region is different, the price is for reference only. Practice has proved that the new scaffold not only safe and reliable construction, installation speed, and the amount of steel scaffolding can be reduced to 33%, disassembly efficiency is improved by more than two times, the construction cost can be decreased, the construction site civilization, clean and tidy.
Q:how much does a scaffold peircing hurt compaired to a nose piercing?
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range