• Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality System 1
  • Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality System 2
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality

Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
1000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar  Scaffolding Galvanized Scaffolding Tube High Quality

1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality

Steel Coupler Rebar Scaffolding Galvanized Scaffolding Accessory with High Quality

2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube: 

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q:Fastener type steel pipe scaffold composed of components
Fastener type steel pipe scaffold components are mainly shelf
Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
Q:Where to use scaffolding in construction
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
Scaffold Piercing Jewellery
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
Q:Bowl buckle type steel pipe scaffolding should set up a few people
Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.
Q:Fastener type steel pipe scaffold accessories
Foot plateThe foot board can be made of steel, wood, bamboo and other materials, each quality should not be greater than 30kg. Stamping steel foot board is commonly used as a foot board, usually with thick 2mm steel plate pressing, length 2-4m, width 250mm, the surface should be anti slip measures. Wooden feet can be used for the thickness of not less than 50mm of cedar wood or pine production, length 3~4m, width 200-250mm, both ends should be equipped with galvanized steel hoop two, in order to prevent the end of the wooden hand foot damage.
Q:also apprx. what chapters is it in?
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords