Stair Case 450*1829*1725*2515 Step Ladder with Hook CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Stair Case 450*1829*1725*2515 Step Ladder with Hook

  • Material :Q235/Q345 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Diameter :450*1829*1725*2515

  • Stair Case 450*1829*1725*2515 Step Ladder with Hook CNBM

  • Stair Case 450*1829*1725*2515 Step Ladder with Hook CNBM



  • Descriptions of Stair Case 450*1829*17255*2515 Step Ladder with Hook

  • Step ladder with hook is an independent research construction ladder based on market needs. Its distinctive hook design, which is convenient and firm, makes safe construction work possible. The punched holes in galvanized steps enable a well drainage and corrosion & skid prevention. In combination with scaffolding structure, the step ladder with hook is convenient、safe and functional construction equipment can be used in any weather condition.

  • Advanced CO2 shielding gas welding design,assuring construction safety.

  • Well drainage and anti-skip step guarantee a safe platform work.

  • Standard step ladder, a necessary & fast construction equipment for scaffolding structure.

  • Galvanized treatment design, Independent research, cost control excellent product.

  • Energy-saving and environment-friendly.



FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Having problems with my scaffold/industrial piercing?
If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
Q:Want to get lip piercing or scaffolding, advice please?
Everyone is different as far as what piercings they think hurt more or less, but based on my own experience, I'd say the scaffolding hurt more by far. Now, I've never had my lower lip pierced, but I had my upper lip area (I used to have angel bites), so I'd image it would have to be similar to the lower lip as far as pain, care, healing. As far as cleaning them, it's like most other piercings, where the best thing for you to use is warm sea salt water. But although everyone's different, the lip is going to be the faster healing of the two I'd say for basically anyone. The scaffolding takes up to a year to fully heal. The lip heals relatively fast;usually anything involving your mouth area heals quicker than other areas of the body-I'm sure you noticed how your tongue healed fast. Or even if you accidentally bite or cut anything involving your mouth, tongue, inside of your cheeks, etc., it heals faster than other areas. As far as the foods other aftercare with it, it is somewhat similar to your tongue in caring for it-just follow your piercer's instructions you'll be fine. Good luck!
Q:Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q:Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:Info on scaffold piercing?
it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
Q:Hester Prynne on the scaffold?
Hester Prynne On The Scaffold
Q:Specification and type of scaffold erection
Specification for scaffold erection(a) basic requirements1 important scaffolding must develop a construction plan, if necessary, to develop safety assurance measures. 2 more than 25m high scaffolding must adopt the fastener type steel tube scaffold, the single pole scaffolding height should be controlled within 50m; height of more than 50m of the scaffolding should be effective measures by a double pole, wire rope, cable stayed unloading segment, and additional design.3 the design of the scaffold shall meet the requirements of the project and shall indicate its use, maximum static load, maximum dynamic load andThe selected design parameters and structural parts shall not be lower than the existing national and industry related safety technical standards.4 scaffolding in the construction of the need to change the original structure, Gago (wide), to its use, etc., must be verified by the technical department, and the approval.
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Cross barName specification A (mm) B (mm) theoretical weight (kg)
Q:When scaffolding is erected on the base of the permanent structural concrete
. Among them, the specification of the steel pipe is from 0.5m to 6m, and the fastener mainly has a rotating shaft, a cross and a joint fastener. Bowl buckle scaffold also uses Phi 48, 3.5 wall thickness steel

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range