Single-side Climbing Formwork CB240&CB210

Ref Price:
Loading Port:
Payment Terms:
TT or LC
Min Order Qty:
10 set
Supply Capability:
200 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Single-side Climbing Formwork

They are framework brackets for supporting large-area wall formwork.

Typical applications for the CB240&CB210 are pier and column/shear wall/core wall/ in the building.

CB210 has smaller size than CB240, it will be cost effective in some condition.


2. Main Features of Single-side Climbing Formwork

A) High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

B) Simple moving procedure by crane

Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

C) Fast striking process without a crane

With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

D) Safe with work platform

The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.


3. Single-side Climbing Formwork Images




4. Single-side Climbing Formwork Specification


CB-240 Structure Sketch

Single-side Climbing Formwork CB240&CB210


CB-210 Structure Sketch

Single-side Climbing Formwork CB240&CB210


5. FAQ of Operating Platform

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  


2) What promises can be done by us?

If interested in Single-side Climbing Formwork Specification, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.


3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  


 4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10~15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Other mass qty of Single-side Climbing Formwork Specification, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. 

By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range