Single-side Climbing Formwork CB240&CB210

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10 set
Supply Capability:
200 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Single-side Climbing Formwork

They are framework brackets for supporting large-area wall formwork.

Typical applications for the CB240&CB210 are pier and column/shear wall/core wall/ in the building.

CB210 has smaller size than CB240, it will be cost effective in some condition.

 

2. Main Features of Single-side Climbing Formwork

A) High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

B) Simple moving procedure by crane

Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

C) Fast striking process without a crane

With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

D) Safe with work platform

The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

 

3. Single-side Climbing Formwork Images

 

 

 

4. Single-side Climbing Formwork Specification

 

CB-240 Structure Sketch

Single-side Climbing Formwork CB240&CB210

 

CB-210 Structure Sketch

Single-side Climbing Formwork CB240&CB210

 

5. FAQ of Operating Platform

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Single-side Climbing Formwork Specification, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10~15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Other mass qty of Single-side Climbing Formwork Specification, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. 

By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to prevent the template support collapsed
The third is to increase the supervision of the construction of high template. Local construction departments should actively promote the grid management, a clear focus on regional monitoring and key areas. For large templates and other dangerous projects, should increase the frequency of inspection, found that timely supervision and rectification, effectively curb the occurrence of major accidents.
Q:More than a certain size of the larger risk of the template works and support system which include
Various types of tool-based template works: including sliding mode, climbing mold, large mold, flying mold and other projects
Q:After the pouring with the template removed and then how to support
When the concrete scaffolding is actually used to support the upper structure, to the concrete conservation period is allowed to remove the general is more than the demolition, and then used in the above level, indoor support with the steel scaffolding does not meet the requirements of the scaffolding decoration, interior decoration With the full scaffolding in the decoration when re-erected. Outdoor scaffolding in the pouring concrete can be erected when the masonry and decoration.
Q:Template Support System Safety Control
When the template is removed, the strength of the concrete must meet the requirements of the Code for Construction and Acceptance of Concrete Structures. Load-bearing template, beam and other cast-in-place structure when the demolition of concrete required to achieve the required strength when the demolition mode. In the demolition process, if found that the actual structure of concrete strength does not meet the requirements, should be suspended mold, the proper treatment, the actual strength to meet the requirements before they can continue to remove.
Q:How is the identification of tall template works?
[2009] No. 87 provides more than 5 meters of the template support project for the more dangerous sub-project, more than 8 meters for more than a certain size of the larger dangerous sub-project.
Q:Template support product features
Beautiful and tidy: the construction site clean and orderly, easier to manage, enhance the image of the project. High precision and stability. Template support advantages: time-saving: 30 square meters of modular structure as an example of field operation only 3-5 minutes to complete. Provincial workers: to improve the construction efficiency, shorten the construction period, the use of traditional structure per square meter to be labor costs about 15 yuan, while the digital steel support only 2 yuan fee can be completed. Material: material costs lower, no wooden side, the purchase of wood and steel pipe, screw, wire, nails.
Q:Scaffolding structure template support frame type
Fastener, bowl button and door steel scaffold material can be used to construct the template support frame, and have their own characteristics. According to their structure can be classified as follows: (1) by type of structure 1) pillar support frame (pillar bearing structure);
Q:What is the difference between a full-screen stent and a floor-mounted stent?
Floor support the fulcrum is the ground, that is, at least to ensure that the ground to do hardening, the local at least can withstand the support of the vertical bar pressure (pressure), and the impact of foundation settlement. The floor is mounted on the floor, although the floor is reinforced concrete (already hardened), but still to prevent the floor under the action of the deformation (vertical deflection) to produce stability problems.
Q:Roof plate support combination structure
Xingmin Weiye roof plate template support structure is one of my company's patented product, the roof template support combination structure by the main keel, vice keel, supporting the top of the bar, the tie rod together, the four together form a roof template support system.
Q:How does the new building shear wall template support safe operation?
Shear wall template support system consists of the following parts: bars, vertical bars, corners, Yang angle, locks, hole card, wall bolts

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range