Single Mast aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Single mast aerial working platform
strengthen aluminum alloy design;make sure it is handle fluenty;mast will not deform,construction is nicety
and compact,machine body design is legerity.All the hydraulic pressure pumping station and motor are all
imported original from occident,insure the quality is excellent!
inner back-up electrical source and manual valve design,
insure drop the control platform in the plat roof or ground if the electricity is broken when
you are doing hight-altitude work.There is movable wheels in the machine shelf base,
can supply better turn off function,and easy to span common ground bars.
Single mast machine is loaded cargo handling assistant device.
Can load and unload by two people.lifting chain load safefy factor more than 10:1,
also have steel wire safety protect system,make sure lift and drop fluently and safe.
Supporting leg occupy area is very small,The biggest distance between platform and wall is 0.34m af-ter fix,
it is very convenient to work.
This product is made of aluminum a-lloy,light-duty,single people series aerial work platform,
electro hydraulic transmission,safety and credibility,the highest work altitude can reach 13.8m,
the biggest load can reach 150KG.
We use universal safe inserting leg,can interlock with brainpower electrically controlled,
can product worker forcedly.Lifting machine'svolume is small,weight is light,very flexible to move and easy
to go through room door and elevator door.Quality and capability and so on have exceeded many safety standard,
such asJC5099-1998,JG/T5103-1998,CE and so on.Products specification will continue to improve,here's photos
just for reference,can check latest design for detailed items.
Code
GTWY-6
GTWY-8
GTWY-9
GTWY-10
GTWY-11
GTWY-12
GTWY-12G
Work height(m)
7.8
9.8
10.8
11.8
12.8
13.8
13.8
Platform height(m)
6
8
9
10
11
12
12
Carrying capacity(kg)
150
150
136
136
120
120
120
Storage length(m)
1.3
1.34
1.34
1.4
1.46
1.52
1.43
Storage width(m)
0.76
0.76
0.76
0.76
0.76
0.76
0.76
Storage height(m)
1.99
1.99
1.99
1.99
1.99
1.99
2.78
Work platform size(m)
Platform length(m)
0.68
0.68
0.68
0.68
0.68
0.68
0.68
Platform width(m)
0.64
0.64
0.64
0.64
0.64
0.64
0.64
Guardrail height(m)
1.1
1.1
1.1
1.1
1.1
1.1
1.1
Supporting leg size(m)
1.55x1.35
1.68x1.48
1.75x1.55
2.10x1.83
2.23x1.9
2.45x2.06
2.26x2.06
The platform away from the wall spacing
0.20
0.15
0.22
0.32
0.36
0.43
0.43
Volatage(v)ACxDC
220/12
220/12
220/12
220/12
220/12
220/12
220/12
Electricity machine pressure(kw)
0.75
0.75
0.75
0.75
0.75
0.75
0.75
Raise/drop speed(m/s)
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
Machine-weight(kg)
320/355
370/405
375/410
410/415
435/470
460/495
460/495
Inclined collection size
- Q:There is no elevator on the 7th floor of the home to install a lift or lift
- Comrade as an ordinary elevator work I tell you, the guerrillas installation of lifts is commonly used or is directly discarded ladder refurbished, safety exist great hidden trouble. If you see your family's life as a game, you can take a baidu elevator and install team.
- Q:What should the chain's main elevator be aware of when installing the chain
- The rail link elevator usually requires a design pit. For equipment and the ground level factors, design should be carried out in accordance with the actual demand design pit size, at the same time when the production equipment shall be carried out in strict accordance with the size of the pit production.
- Q:Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
- Press the switch and then descend the elevator down to the second floor and then climb to the right hand side of the cargo and pull down the first gear. Walk to the elevator and climb down the stairs to open the door between the second and third floors. Go up to the third floor and turn the elevator to the third floor. And then you go back to the second floor and you go to the third floor and you go to the sandwich and you get the second gear. Go up to the fourth floor and press the elevator up, go back to the third floor and switch to the three or four floors and twist the third gear. Come down to the entrance of the third floor elevator and then go in and use a shotgun to smash the three floors and the four floors. On the fourth floor elevator again back to the fourth floor, between the back to the fourth floor on the elevator by just open the channel on the wall opposite the detour to the fourth floor mezzanine dropped last gear lever.
- Q:The automatic mahjong machine has a lift station always one. What is the other three normal
- Up when you use hand pressure, will watch it sink after coming up, if I don't stop for a second long came up again can eliminate motor, friction, but institutions, hall signal detection, duplication of effort.
- Q:How does hydraulic platform change sealing ring, how to operate
- Because the concrete structure of hydraulic cylinder is different, the order of disassembly is different, and it should be judged according to the specific situation.
- Q:What is the size of the hydraulic elevator platform for 2T
- Product structure strong, big load, steady lifting, simple and convenient installation and maintenance, is economic and practical alternative between low floor elevator ideal goods transportation equipment. According to the requirements of the lifting platform installation environment and use, can choose different stationary hydraulic lift, choose different optional configuration, lifting goods task, achieve better use effect.
- Q:Where is the mobile lift platform?
- It is. The beijing-shanghai railway, the beijing-shanghai expressway, the beijing-shanghai expressway, the qingyin high speed, the ziqing highway across the north and south, is close at hand. Favorable geographical location and convenient traffic bring sufficient conditions for the development of the company. Shengze technical force is strong, the process flow is advanced and reasonable, the detection method is complete. The company's products have the advantages of novel design, reasonable structure, stable lift, safe load, simple operation and convenient maintenance. Products are widely used in various industry, such as industrial and mining enterprises, production lines, railway, airport, dock, station, cargo handling, warehousing logistics, high lift, plant site equipment installation, etc.
- Q:Is the music console working? Want to start a, afraid to buy expensive again.
- And, it's easy to adjust, because the built-in gas spring, the girl can adjust the height easily. At the same time, 150 cm to 185 height is suitable.
- Q:What is the use of a silk pole elevator?
- The product can be widely used in metallurgy, machinery, chemical industry, construction, water conservancy, textile, medical, culture and health, etc. Such as mechanical processing of the weight of the lifting platform, the turning device and the plastic processing machine, etc. Installation and maintenance of the climbing ladder and the tool lift frame, the motorcycle maintenance platform, the hot liquid pouring; Architectural aspects for mobile devices and composite templates, adjustable Windows, walls, walls, etc. Cultural hygiene can be used for elevating stage, adjusting swimming pool floor height, adjusting operating table height, etc.
- Q:What happened to the rise and fall
- The motor is missing (the motor is not moving, and there is a buzzing sound) to check the circuit breaker and the electrical wiring. The drop valve is open when the drop button is released, and the voltage meter is used to check if the valve has electricity. If there is no electricity, check the line and troubleshoot it. If there is electricity, the valve itself is out of fault. The slide valve must be clean and flexible. The overflow valve is adjusted to the relief valve. Under 100% rated load to adjust the oil level is too low, the oil pump hydraulic oil filled up at a empty absorption, oil absorption filter clogging, clean filter, oil leakage, check the suction tubing and connectors; Tighten the joint.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single Mast aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords